Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

CLASS 5 BOILER MAIN EXAM TEST 2025/2026 QUESTIONS WITH ANSWERS GRADED A+

Document preview thumbnail
Preview 2 out of 13 pages

Dry Pipe - Pipe running along the top of steam space in which slots are cut in top or side for purpose of admitting only dry steam to line. One has blank ending, other is connected to steam outlet. Drain holes drilled on bottom. What is the point of a dry pipe - to aid in removal of moisture from steam as it leaves the steam drum what kind of stamp must a company posses to to weld on boilers - R stamp ASME - American Society of Mechanical Engineers According to ASME, how many valves must be on the main steam line of a high pressure steam boiler? - 2. Jurisdiction ends after second. Longitudinal joint - Joint subject to greatest stress Bottom Blowdown Valve - removes sludge and sediment, drains boiler for maintenance, located on bottom of mud drum in WTB or bottom of boiler on Firetube Breeching - exhaust pipe between boiler and chimney

Content preview

CLASS 5 BOILER MAIN EXAM TEST 2025/2026 QUESTIONS
WITH ANSWERS GRADED A+
✔✔Dry Pipe - ✔✔Pipe running along the top of steam space in which slots are cut in top
or side for purpose of admitting only dry steam to line. One has blank ending, other is
connected to steam outlet. Drain holes drilled on bottom.

✔✔What is the point of a dry pipe - ✔✔to aid in removal of moisture from steam as it
leaves the steam drum

✔✔what kind of stamp must a company posses to to weld on boilers - ✔✔R stamp

✔✔ASME - ✔✔American Society of Mechanical Engineers

✔✔According to ASME, how many valves must be on the main steam line of a high
pressure steam boiler? - ✔✔2. Jurisdiction ends after second.

✔✔Longitudinal joint - ✔✔Joint subject to greatest stress

✔✔Bottom Blowdown Valve - ✔✔removes sludge and sediment, drains boiler for
maintenance, located on bottom of mud drum in WTB or bottom of boiler on Firetube

✔✔Breeching - ✔✔exhaust pipe between boiler and chimney

✔✔Hot Water SUPPLY Boiler - ✔✔water heater for domestic use

✔✔Safety *Relief* Valve - ✔✔Prevents overpressure of water boiler. Spring loaded pop
type, discharge capacity rated in Btu/hr. Must be hand tested quarterly in all boilers.
Minimum size 3/4. Can be T&P or Pressure only

✔✔How often does a Safety Relief Valve need to be tested - ✔✔Quarterly

✔✔Minimum size for safety relief valve - ✔✔3/4

✔✔Superheater - ✔✔increases steam temp but not pressure. allows for use of steam
longer. Increases efficiency. exposes steam to combustion gases so it won't condense
after first stage of steam turbine. Located in radiant outlet area of boiler

✔✔Dry firing - ✔✔flow of steam is necessary to keep superheater from overheating and
getting damaged

✔✔Reheater - ✔✔increases steam temp for latter sections of steam turbine

✔✔Economizer - ✔✔preheats feed water

, ✔✔pre heater - ✔✔pre heats combustion air. Important in solid fuel burners.

✔✔Why does heat transfer from hot to cold? - ✔✔Due to difference in temperature or
density

✔✔Law of conservation of mass - ✔✔Cannot be created or destroyed, only altered

✔✔PSIG - ✔✔Gauge pressure

✔✔PSIA - ✔✔Absolute pressure= gauge + 1 atm

✔✔1 Atm. - ✔✔14.73 psia

✔✔Celsius to Fahrenheit - ✔✔C= (F-32) / 1.8

✔✔Fahrenheit to Celsius - ✔✔F= (C *1.8) +32

✔✔Pyrometer - ✔✔Can be thermal electric or optical. Measures stack gas temperatures
in breeching

✔✔British Thermal Unit - ✔✔amt. of energy required to increase 1 lb of water by 1
degree Fahrenheit

✔✔Sensible heat - ✔✔Heat you can sense, feel, measure

✔✔Latent heat - ✔✔causes physical change in state or phase but no change in
temperature

✔✔How many Btu of latent heat does it take to change 1 lb water to steam? - ✔✔970.4
Btu of latent heat

✔✔Specific heat - ✔✔amount of heat energy required to increase the temperature of 1
lb of substance by 1 degree fahrenheit

✔✔3 types of heat transfer - ✔✔Conduction, convection, radiation

✔✔Conduction - ✔✔Direct contact, no mix

✔✔Convection - ✔✔mixing of 2 or more fluids to become 1

✔✔radiation - ✔✔electrical energy waves. Heats objects not air

Document information

Uploaded on
April 10, 2025
Number of pages
13
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK
3.5
(41)
Sold
287
Followers
11
Items
36004
Last sold
6 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions