Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

VA DEQ SWM INSPECTOR EXAM QUESTIONS WITH COMPLETE SOLUTIONS GUARANTEED PASS BRAND NEW 2025.

Document preview thumbnail
Preview 2 out of 12 pages

VA DEQ SWM INSPECTOR EXAM QUESTIONS WITH COMPLETE SOLUTIONS GUARANTEED PASS BRAND NEW

Content preview

VA DEQ SWM INSPECTOR EXAM QUESTIONS WITH COMPLETE
SOLUTIONS GUARANTEED PASS BRAND NEW 2025



What element is targeted by water quality criteria? -
CORRECT ANSWER - >Phosphorous, it indicates pollution
by bonding with other pollutants.

At what % impervious cover are streams substantially
affected? - CORRECT ANSWER - >25%

what is the site-based load limit for water quality? -
CORRECT ANSWER - >0.41 lbs/acre/yr total phosphorous

Virginia Runoff Reduction Method- method of load
calculations - CORRECT ANSWER - >load calculations
based on land cover type and soil type.

what must happen to potentially harmful sheet flow
runoff? - CORRECT ANSWER - >Must be diverted to
stormwater conveyance system.

SWM ponds must be able to convey water safely up to
what level storm event? - CORRECT ANSWER - >must be
able to safely convey up to a 100 yr storm.

, Define LDA - CORRECT ANSWER - >Land disturbing
activity; any man-made change to the land surface that
potentially changes its runoff characteristics; includes
clearing, grading, and excavation.

What size LDA must comply with stormwater
management regulation? in CPBA areas? - CORRECT
ANSWER - >anything of 1 acre or more, or 2500 ft^2 in
CPBA areas; may be more stringent locally.

what are some activities exempt from SWM regulations?
- CORRECT ANSWER - >mining, agriculture, sewer
discharges, local reclamation programs, routine
maintenance of preexisting operations, public emergency
activity

what term basically means a plea deal for stormwater
offenders? - CORRECT ANSWER - >consent order, which
replaces penalties with fines.

how long does VSMP authority have to review SWM
plan? - CORRECT ANSWER - >15 days to review and
determine approval, and notify applicant.

How often must a VSMP authority inspect an LDA? -
CORRECT ANSWER - >Periodically.

Document information

Uploaded on
April 10, 2025
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$26.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
23
Followers
0
Items
1588
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions