Which of the following tools is sufficient for the compacting of concrete in a small project? -
ANS-Hand tamper

At 50°F, how long should the concrete be protected to attain sufficient strength (normally 500
Psi)? - ANS-48 Hours

Which of the following arrangements can be used to keep the concrete at the recommended
50°F temperature for allowing proper setting? - ANS-Heaters OR Thermal blankets

What is the 'Swell Factor' for sandy loam soil when performing excavation work for a concrete
structure? - ANS-About 1.1 to 1.2

Which of the following building specification and cost estimating standard systems is accepted
as ASTM standard? - ANS-UniFormat System

Which of the following factors directly impact each other in the process of cost estimation for a
concrete building project? - ANS-Interest rate, Holding cost, Cost escalation

Which of the following points are true about Work Breakdown Structure (WBS) in the planning of
a construction project? - ANS-Decomposing of a task into doable, measureable, estimable , and
schedulable units

Which of the following statements is correct about the finishing of a concrete? - ANS-Concrete
should be finished once bleed water and surface sheen disappear

An excavation of 10 cubic meters is done on any soil. Which of the following statements is true
about the refilling volume of that excavation with the same type of soil material? - ANS-More
than 10 cubic meters

What type of release oil is commonly used for the construction of wooden forms in the concrete
industry? - ANS-Paraffin base oil

Initial and final setting time values of concrete are normally considered from: - ANS-Mixing of
water into cement material

Form-exposed corners and edges are commonly beveled to avoid any chipping by using: -
ANS-Chamfer strips

, Which of the following are the basic crafts used in estimating the concrete construction cost in
the industry? - ANS-Ironworker, Carpenter, Teamster, Cement mason

Which of the results of a concrete slump test has the highest workability? - ANS-True Slump

Explanation:
Workability is the ease or difficulty of placing concrete in a particular location. For example, a
stiff but plastic mix with large aggregate would be workable in large open form but not in a wall
with closely spaced reinforcement. Please note that the slump test is NOT a measure of
workability, and it should not be used to compare mixes of entirely different proportions or
containing different kinds of aggregate.

What is the maximum depth of a foundation footing commonly used in concrete construction? -
ANS-78"

Which of the following factors should be estimated as earthwork components in project
planning? - ANS-ALL OF THESE

-Rough grading, Excavation, Soil backfilling

-Soil compacting, Fill material compacting, Excavation

-Excavated soil hauling, Soil backfilling, Rough grading

According to American Concrete Institute ACI-301 standard, what is the maximum volume of
concrete that requires a strength test of concrete? - ANS-Each 100 cubic yards

What are the recommended sizes of granular for a floor slab or foundation of a small-to
medium-size building? - ANS-4" to 6"

Which of the following are the main objectives of applying sealers on exterior concrete
surfaces? - ANS-To keep salt and water out of the concrete

What is the slab curling impact of direct placement of concrete on the moisture barrier as
indicated by American Concrete Institute guidelines? - ANS-Slab curling increases

Which of the following activities are recommended before placing the concrete into the forms? -
ANS-Application of form release oil and water

Which of the following is the standard spacing commonly used between two adjacent expansion
joints on a 4" thick concrete slab? - ANS-10 to 12 feet

Explanation:

Document information

Uploaded on
April 9, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
0
Items
638
Last sold
1 year ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions