• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

NASCLA Accredited Exam Study Questions And Answers 2025

Document preview thumbnail
Preview 2 out of 5 pages

NASCLA Accredited Exam Study Questions And Answers 2025 / Elevator call buttons - Answer-Raised or flush, minimum diameter of 1 inch /.Swell factor - Answer-Change in hauling and equipment efficiency /.Front loading washing machine - Answer-Maximum allowable offset for clear floor space /.Employer on a jobsite - Answer-Not required to provide defibrillator /.Project contract - Answer-Lump sum, retainage, final payment amount /.Vapor retarder - Answer-Installed around both layers of insulation /.Individuals working in a trench - Answer-Maximum lateral distance from means of egress /.Lightweight curtain wall - Answer-Building insulation and external panels /.Shoring system - Answer-Prevents potential shoring failure /.Hotel with 20 sleeping rooms - Answer-Minimum number of visible fire alarm notification devices /.Personal fall arrest systems and guardrails - Answer-Installed or provided for walkways and platforms /.Finishing concrete - Answer-Excessive moisture loss likely to cause plastic shrinkage cracking /.Income recognition method - Answer-Recognizes income when work is done but not received /.Waffle slab floor - Answer-Formed by metal or plastic resting on a flat deck /.Open web steel joist - Answer-Maximum depth /.Excavation load - Answer-Reduced through wheeled loading, tracked excavation, slot dozing, or loader bucketing /.Prevailing wage rates - Answer-Included in the general conditions of the contract documents /.Compressed air - Answer-Not used for cleaning purposes above 30 psi /.Swell percentage - Answer-Percentage increase in volume of excavated soil /.Thresholds at doorways - Answer-Maximum height above finished floor or landing /.Crane operating near power lines - Answer-Minimum approach distance permitted /.Deck attachment to building frame - Answer-Methods of attachment excluding arc puddle welds /.Pivot or side-hinged swinging doors - Answer-Swing in the direction of egress travel /.Plywood thickness - Answer-Minimum thickness for subfloor joists spaced 16 inches on center /.Construction waste - Answer-Amount generated during new construction of office space /.Performance bond - Answer-Ensures completion of a project and protection against liens, claims, and defaults /.Labor agreement - Answer-Required between contractor and union when employing union labor /.Installed truss - Answer-Maximum allowable amount out of plumb /.Wood flooring acclimation - Answer-Minimum number of days stored in the building before installation /.Electric screw guns - Answer-Used for fastening metal decking and driving self-drilling screws /.Accessible parking spaces - Answer-Minimum number required for a parking lot with 30 spaces /.Radiant type temporary room heater - Answer-Installed with clearance to combustible material /.Wall penetrations - Answer-Details to be incorporated into the project /.Excavation depth - Answer-Maximum depth below the bottom of a shield system

Content preview

NASCLA Accredited Exam Study Questions And
Answers 2025

/ Elevator call buttons - Answer-Raised or flush, minimum diameter of 1 inch

/.Swell factor - Answer-Change in hauling and equipment efficiency

/.Front loading washing machine - Answer-Maximum allowable offset for clear floor
space

/.Employer on a jobsite - Answer-Not required to provide defibrillator

/.Project contract - Answer-Lump sum, retainage, final payment amount

/.Vapor retarder - Answer-Installed around both layers of insulation

/.Individuals working in a trench - Answer-Maximum lateral distance from means of
egress

/.Lightweight curtain wall - Answer-Building insulation and external panels

/.Shoring system - Answer-Prevents potential shoring failure

/.Hotel with 20 sleeping rooms - Answer-Minimum number of visible fire alarm
notification devices

/.Personal fall arrest systems and guardrails - Answer-Installed or provided for
walkways and platforms

/.Finishing concrete - Answer-Excessive moisture loss likely to cause plastic shrinkage
cracking

/.Income recognition method - Answer-Recognizes income when work is done but not
received

/.Waffle slab floor - Answer-Formed by metal or plastic resting on a flat deck

/.Open web steel joist - Answer-Maximum depth

/.Excavation load - Answer-Reduced through wheeled loading, tracked excavation, slot
dozing, or loader bucketing

/.Prevailing wage rates - Answer-Included in the general conditions of the contract
documents

, /.Compressed air - Answer-Not used for cleaning purposes above 30 psi

/.Swell percentage - Answer-Percentage increase in volume of excavated soil

/.Thresholds at doorways - Answer-Maximum height above finished floor or landing

/.Crane operating near power lines - Answer-Minimum approach distance permitted

/.Deck attachment to building frame - Answer-Methods of attachment excluding arc
puddle welds

/.Pivot or side-hinged swinging doors - Answer-Swing in the direction of egress travel

/.Plywood thickness - Answer-Minimum thickness for subfloor joists spaced 16 inches
on center

/.Construction waste - Answer-Amount generated during new construction of office
space

/.Performance bond - Answer-Ensures completion of a project and protection against
liens, claims, and defaults

/.Labor agreement - Answer-Required between contractor and union when employing
union labor

/.Installed truss - Answer-Maximum allowable amount out of plumb

/.Wood flooring acclimation - Answer-Minimum number of days stored in the building
before installation

/.Electric screw guns - Answer-Used for fastening metal decking and driving self-drilling
screws

/.Accessible parking spaces - Answer-Minimum number required for a parking lot with
30 spaces

/.Radiant type temporary room heater - Answer-Installed with clearance to combustible
material

/.Wall penetrations - Answer-Details to be incorporated into the project

/.Excavation depth - Answer-Maximum depth below the bottom of a shield system

/.Project Schedule of Values - Answer-Calculates progress payment based on
completion percentage of tasks

Document information

Uploaded on
April 8, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainariam
3.4
(29)
Sold
158
Followers
7
Items
8427
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions