Questions And Answers 100% Solved
The review of the EIS by EMB shall be guided by the following general criteria except:
A.
That environmental considerations are integrated into the overall project planning
B.
That the assessment is technically sound
C.
That proposed environmental mitigation measures are complete
D.
That social acceptability is based on informed public participation
Correct Answer
C. That proposed environmental mitigation measures are complete
Explanation
,The review of the EIS by EMB is guided by general criteria to ensure that environmental
considerations are integrated into the overall project planning, that the assessment is
technically sound, and that social acceptability is based on informed public participation.
However, the exception is that the review does not focus on whether the proposed
environmental mitigation measures are complete.
Rate this question:
1
2.
EMB may validate whether or not the EIS was integrated with project planning by requiring
relevant documentary proofs such as:
A.
Terms of reference
B.
Monitoring plan
C.
Feasibility study
D.
Additional information
,Correct Answer
A. Terms of reference
Explanation
The terms of reference document outlines the objectives, scope, and responsibilities of a
project. By requiring this document as a proof, EMB can ensure that the EIS (Environmental
Impact Statement) was integrated with project planning. The terms of reference would include
details on how the EIS was considered and incorporated into the project planning process. This
helps to ensure that environmental considerations were taken into account and that the project
is being implemented in a sustainable and responsible manner.
Rate this question:
3.
Specific detailed engineering design shall not be required at the EIS review stage.
A.
True
B.
False
C.
Not stated
D.
, It depends
Correct Answer
A. True
Explanation
The statement suggests that specific detailed engineering design is not required at the EIS
(Environmental Impact Statement) review stage. This implies that the focus of the review is on
assessing the environmental impact rather than the technical design details. Therefore, the
answer "true" indicates that specific detailed engineering design is not necessary at this stage.
Rate this question:
1
4.
If there is available and relevant secondary data to a development proposal, the EIARC should
require additional primary sampling.
A.
False
B.
True
C.
Not stated