Permit Technician Practice Exam
Approved construction documents shall be retained by the Building Department for no less than
________ from the date of completion of permitted work. - ANSWER-180 days
Uses that were illegally established prior to the adoption of the local zoning code shall: - ANSWER-
remain illegal
When local government has acted beyond the scope of its powers it is known as _____ - ANSWER-
ultra vires
An official inspection report should contain which of the following: - ANSWER-Clear references to the
code section and violation written in everyday language.
Which of the following is not necessary in taking down a complaint? - ANSWER-Name, address, phone
of violator
Which of the following documents should not be accepted by a building department? - ANSWER-
Unsigned written app from either owner or authorized agent.
What is the most important documents that a code official and building department have to
determine what the building contractor is doing on site? - ANSWER-Building permit and application
for building permit.
An elevation certificate is required for ____ - ANSWER-Lowest floor level area in the flood hazard area.
A CofO does not need to contain ____ - ANSWER-Zoning permit number and date of issuance.
It shall be the duty of the holder of the ______ or their authorized agent to notify the building official
when work is ready for inspection. - ANSWER-Building Permit.
Which of the following would not be issued a CofO as a use B? - ANSWER-Drug Store.
A zoning approval shall expire ______ if the use or activity is not established. - ANSWER-180 days
A 4.5" line at 3/4" = 1'0" equals - ANSWER-6.25ft
In design, review and construction, the ______ view shows the proposed construction as if it were
being viewed by air. - ANSWER-Plan (Site plan)
A site plan for a proposed building should not contain______ - ANSWER-Location of structures of
adjacent properties.
Construction documents submitted with a permit application for commercial construction shall be? -
ANSWER-Prepared by a registered design professional.
A permit application shall be considered abandoned after _____ days past the date of filing if not
pursued in good faith. The building official may grant multiple extensions, if required in writing, for
periods not exceeding ______ days each. - ANSWER-180
The international building code shall apply to all but which of the following. - ANSWER-Residential;
three story town homes.
, The architectural symbol BRG stands for? - ANSWER-bearing
A standard in building code only becomes law to the extent which it is ______ in a model. - ANSWER-
referenced
The zoning ordinance map must show the ______ - ANSWER-District boundaries.
Who assumes responsibility for issuing building permits? - ANSWER-Building official.
The building code does not permit an appeal based on which of the following? - ANSWER-Full
compliance would cause a hardship.
One of the primary reasons for requiring a building permit is to ______. - ANSWER-Verify compliance
with minimum construction standards.
Which of the following would not be considered one of the size typical parts of a building permit? -
ANSWER-Census bureau's copy.
A building permit is ______. - ANSWER-A license to build.
Which of the following is not generally part of the four-step process when drafting a zoning ordinance?
- ANSWER-Hold a general election to adopt the zoning ordinance.
The Standard Zoning Enabling Act was established by the US Department of Commerce in ______. -
ANSWER-1924
Zoning ordinances must include provisions for nonconforming uses, which are ____. - ANSWER-Uses
that existed before the zoning ordinance was in effect.
Typically, when there is a conflict between the building zone and the zoning ordinance, the ______ is
enforced. - ANSWER-Most stringent requirement.
An easing of the terms of the zoning ordinance is known as a ______. - ANSWER-Variance.
The two parts of a zoning ordinance are ____ and _____. - ANSWER-A map and the text.
Which of the following is not considered a benefit of a zoning code? - ANSWER-Establishes maximum
speed regulations in residential districts.
An area or district in a city or town under special restrictions to the types of buildings that may be
erected is known as a ______. - ANSWER-Zone.
ICC's square foot construction costs table is based on. - ANSWER-Type of construction and occupancy
group.
Which of the following is not typically a function of a building department? - ANSWER-Prohibit
specific construction methods and materials.
Permit and plan review fees are collected to ______. - ANSWER-Offset the cost of departmental
operations.
Which of the following is not under the authority of the building official? - ANSWER-Grant variances.
All of the following are typically considered one of the three major zoning districts except ____. -
ANSWER-Entertainment.
Approved construction documents shall be retained by the Building Department for no less than
________ from the date of completion of permitted work. - ANSWER-180 days
Uses that were illegally established prior to the adoption of the local zoning code shall: - ANSWER-
remain illegal
When local government has acted beyond the scope of its powers it is known as _____ - ANSWER-
ultra vires
An official inspection report should contain which of the following: - ANSWER-Clear references to the
code section and violation written in everyday language.
Which of the following is not necessary in taking down a complaint? - ANSWER-Name, address, phone
of violator
Which of the following documents should not be accepted by a building department? - ANSWER-
Unsigned written app from either owner or authorized agent.
What is the most important documents that a code official and building department have to
determine what the building contractor is doing on site? - ANSWER-Building permit and application
for building permit.
An elevation certificate is required for ____ - ANSWER-Lowest floor level area in the flood hazard area.
A CofO does not need to contain ____ - ANSWER-Zoning permit number and date of issuance.
It shall be the duty of the holder of the ______ or their authorized agent to notify the building official
when work is ready for inspection. - ANSWER-Building Permit.
Which of the following would not be issued a CofO as a use B? - ANSWER-Drug Store.
A zoning approval shall expire ______ if the use or activity is not established. - ANSWER-180 days
A 4.5" line at 3/4" = 1'0" equals - ANSWER-6.25ft
In design, review and construction, the ______ view shows the proposed construction as if it were
being viewed by air. - ANSWER-Plan (Site plan)
A site plan for a proposed building should not contain______ - ANSWER-Location of structures of
adjacent properties.
Construction documents submitted with a permit application for commercial construction shall be? -
ANSWER-Prepared by a registered design professional.
A permit application shall be considered abandoned after _____ days past the date of filing if not
pursued in good faith. The building official may grant multiple extensions, if required in writing, for
periods not exceeding ______ days each. - ANSWER-180
The international building code shall apply to all but which of the following. - ANSWER-Residential;
three story town homes.
, The architectural symbol BRG stands for? - ANSWER-bearing
A standard in building code only becomes law to the extent which it is ______ in a model. - ANSWER-
referenced
The zoning ordinance map must show the ______ - ANSWER-District boundaries.
Who assumes responsibility for issuing building permits? - ANSWER-Building official.
The building code does not permit an appeal based on which of the following? - ANSWER-Full
compliance would cause a hardship.
One of the primary reasons for requiring a building permit is to ______. - ANSWER-Verify compliance
with minimum construction standards.
Which of the following would not be considered one of the size typical parts of a building permit? -
ANSWER-Census bureau's copy.
A building permit is ______. - ANSWER-A license to build.
Which of the following is not generally part of the four-step process when drafting a zoning ordinance?
- ANSWER-Hold a general election to adopt the zoning ordinance.
The Standard Zoning Enabling Act was established by the US Department of Commerce in ______. -
ANSWER-1924
Zoning ordinances must include provisions for nonconforming uses, which are ____. - ANSWER-Uses
that existed before the zoning ordinance was in effect.
Typically, when there is a conflict between the building zone and the zoning ordinance, the ______ is
enforced. - ANSWER-Most stringent requirement.
An easing of the terms of the zoning ordinance is known as a ______. - ANSWER-Variance.
The two parts of a zoning ordinance are ____ and _____. - ANSWER-A map and the text.
Which of the following is not considered a benefit of a zoning code? - ANSWER-Establishes maximum
speed regulations in residential districts.
An area or district in a city or town under special restrictions to the types of buildings that may be
erected is known as a ______. - ANSWER-Zone.
ICC's square foot construction costs table is based on. - ANSWER-Type of construction and occupancy
group.
Which of the following is not typically a function of a building department? - ANSWER-Prohibit
specific construction methods and materials.
Permit and plan review fees are collected to ______. - ANSWER-Offset the cost of departmental
operations.
Which of the following is not under the authority of the building official? - ANSWER-Grant variances.
All of the following are typically considered one of the three major zoning districts except ____. -
ANSWER-Entertainment.