Permit b- bcorrect banswers✔✔No bperson bshall bcommence bconstruction bof bany
bbuilding bwhich brequires bconnection bto ba bsewage bsystem bunless ba bvalid b_______
bhas bbeen bissued
50 b- bcorrect banswers✔✔a bseptic btank bmust bbe bat bleast b_____ bfeet bfrom bany
bwell, blake, bstream, bswampy barea, bactive birrigation bditch bor b100 byear bfloodplain
24 b- bcorrect banswers✔✔certified binstallers bshall bnotify bthe bcounty benvironmental
bhealth bdepartment b______ bhoirs bprior bto bcompletion bof bany binstallation
10 b- bcorrect banswers✔✔Septic btanks bshall bhave ba bminimum bof b_____ bfeet bof
bschedule b40 bPVC bpipe bentering band bexiting bthe btank
10 b- bcorrect banswers✔✔A bdrain bfield bmust bbe blaid bat bleast b____ bfeet bhorizontally
bfrom bany bexisting bor bproposed bwater bline
1/4 b- bcorrect banswers✔✔The bsewer bline bbetween bthe bdwelling band bseptic btank
bshall bbe bplaced bat ba bminimum bdownward bslope bof b______ bin/ft
5 b- bcorrect banswers✔✔Absorption btrenches bshall bbe bseparated bby ba bminimum bof
b_______ bft bas bmeasured bfrom bdistribution bpipe bto bdistribution bpipe.
Distribution bBox b- bcorrect banswers✔✔___________ bmay bbe bused bin bgravity
bsystems bof blieu bof bmanifolds
Backfilling b- bcorrect banswers✔✔The bproperty bowner band/or bperson binstalling ba
bsewage bsystem bmust bnotify bthe bcounty benvironmental bhealth bdepartment bfor ba
bfinal binspection bprior bto b________
10 b- bcorrect banswers✔✔A bseptic btank bmust bbe bat bleast b______ bfeet bfrom bany
bfoundation bwall
test b- bcorrect banswers✔✔A b_________ bpit, bto bdetermine bsoil bcomposition bmust bbe
bmade bprior bto bseptic bsystem bdesign bby bthe bowner bor bcontractor
Answers
Permit b- bcorrect banswers✔✔No bperson bshall bcommence bconstruction bof bany
bbuilding bwhich brequires bconnection bto ba bsewage bsystem bunless ba bvalid b_______
bhas bbeen bissued
50 b- bcorrect banswers✔✔a bseptic btank bmust bbe bat bleast b_____ bfeet bfrom bany
bwell, blake, bstream, bswampy barea, bactive birrigation bditch bor b100 byear bfloodplain
24 b- bcorrect banswers✔✔certified binstallers bshall bnotify bthe bcounty benvironmental
bhealth bdepartment b______ bhoirs bprior bto bcompletion bof bany binstallation
10 b- bcorrect banswers✔✔Septic btanks bshall bhave ba bminimum bof b_____ bfeet bof
bschedule b40 bPVC bpipe bentering band bexiting bthe btank
10 b- bcorrect banswers✔✔A bdrain bfield bmust bbe blaid bat bleast b____ bfeet bhorizontally
bfrom bany bexisting bor bproposed bwater bline
1/4 b- bcorrect banswers✔✔The bsewer bline bbetween bthe bdwelling band bseptic btank
bshall bbe bplaced bat ba bminimum bdownward bslope bof b______ bin/ft
5 b- bcorrect banswers✔✔Absorption btrenches bshall bbe bseparated bby ba bminimum bof
b_______ bft bas bmeasured bfrom bdistribution bpipe bto bdistribution bpipe.
Distribution bBox b- bcorrect banswers✔✔___________ bmay bbe bused bin bgravity
bsystems bof blieu bof bmanifolds
Backfilling b- bcorrect banswers✔✔The bproperty bowner band/or bperson binstalling ba
bsewage bsystem bmust bnotify bthe bcounty benvironmental bhealth bdepartment bfor ba
bfinal binspection bprior bto b________
10 b- bcorrect banswers✔✔A bseptic btank bmust bbe bat bleast b______ bfeet bfrom bany
bfoundation bwall
test b- bcorrect banswers✔✔A b_________ bpit, bto bdetermine bsoil bcomposition bmust bbe
bmade bprior bto bseptic bsystem bdesign bby bthe bowner bor bcontractor