• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

Swm Deq (Actual 2025/2026) Exam Questions With Verified Correct Answers Graded A+

Document preview thumbnail
Preview 2 out of 15 pages

SWM DEQ (ACTUAL 2025/2026) EXAM QUESTIONS WITH VERIFIED CORRECT ANSWERS GRADED A+

Content preview

1|Page



SWM DEQ (ACTUAL 2025/2026) EXAM QUESTIONS
WITH VERIFIED CORRECT ANSWERS GRADED A+
The Virginia Stormwater Management Program is authorized by the ______ and
administered through the ______ - (answer)Virginia Stormwater Management
Act, Virginia Stormwater Management Program Regulation



VPDES Permit/Construction GP authorizes discharge of stormwater from
construction activities that are - (answer)greater than or equal to an acre



The Stormwater Management Act requires the State Water Control Board to -
(answer)permit, regulate, and control stormwater runoff



DEQ has ___ days to complete review of real or potential inter-jurisdictional
impacts upon request - (answer)90



The Stormwater Management Act requires the following individuals to obtain and
maintain a certificate of competency - (answer)staff of a stormwater program,
anyone contracted by a VSMP authority, standard and specification holders



The dual certificate will expire three years from - (answer)the latest date of the
certificates



SWM plan must be approved by ___ before land disturbance - (answer)VSMP
program authority

, 2|Page


The water quality criteria sets a site-based load limit of ____ of total phosphorus
for new development - (answer)0.41 lbs/acre/year



The phosphorus load limit uses the - (answer)10% impervious cover



Part II B and II C water quantity criteria addresses - (answer)channel protection
and flood protection



Which two plans in the SWPPP must be approved? - (answer)SWM plan, ESC plan



Does the SWM plan address runoff during or after construction? - (answer)post-
construction



What is the lower limit of the range of imperviousness that can result in stream
degradation? - (answer)10%



What do land disturbing activities consist of? - (answer)excavating, clearing,
grading



LDA threshold for the SWM Act and Regulation - (answer)1 acre or 2500 square
feet for Chesapeake Bay Preservation Act



In situations where an initial exemption was applicable because LDAs were
related to emergency work, VSMP authority shall be advised of the disturbance

Document information

Uploaded on
March 29, 2025
Number of pages
15
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
Free
Download

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
502
Followers
2
Items
3046
Last sold
14 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions