CALIFORNIA UST SERVICE TECHNICIAN PART 1 EXAM ACTUAL EXAM QUESTIONS AND
CORRECT DETAILED ANSWERS WITH RATIONALES|AGRAD
July 1 2005, service techs shall possess or work under someone who has a current certification indicating
he or she has passed the ? -(ANSWER)California UST service technician exam
ICC cert must be renewed every? -(ANSWER)24 months
Service techs must posses or be employed by a person who has the appropriate contractors license
unless? -(ANSWER)The individual has a Tank testing licens
Service tech is defined by any individual who? -(ANSWER)Test UST monitoring equipment
Trouble shoots UST systems
Installs UST monitoring equipment
If the manufacturer training no longer exist , the local angency may? -(ANSWER)Approve comparable
alternat training .
UST includes? -(ANSWER)Tank and connected piping
What is considered and UST -(ANSWER)petroleum storage tank
What UST system meets the requirements for secondary containment? -(ANSWER)Doubled wall tanks
According to title 23; the following piping components if installed after July 1 1987 must have secondary
containment -(ANSWER)Pressured product piping
Considered "pipe" on tanks installed after July 1 2003 -(ANSWER)Pressured product piping and below
ground vapor recovery
, CALIFORNIA UST SERVICE TECHNICIAN PART 1 EXAM ACTUAL EXAM QUESTIONS AND
CORRECT DETAILED ANSWERS WITH RATIONALES|AGRAD
Under dispenser containment (UDC) was required for all UST systems by -(ANSWER)December 31 2003
System for exchanging gas vapors in a storage tank and product in a fuel delivery truck -(ANSWER)Stage
1 vapor recovery
An approved method for non visual monitoring for existing UST systems. -(ANSWER)Statistical Inventory
Reconciliation (SIR)
ATG must be capable for detecting a release of ? -(ANSWER).2 gallons per hour
Manual inventory reconciliation. -(ANSWER)No longer an approved method for non visual monitoring on
existing UST systems
Automatic line leak detectors installed on underground piping with secondary containment shall be
capable of tetecting a leak of ? -(ANSWER)3 gallons per hour at 10 psi
ATG should be programmed to test the tank ? -(ANSWER)At least monthly
According to PEI RP 300 a combustible gas can be used to ? -(ANSWER)Detect vapor leaks in a vapor
recovery system.
According to PEI RP 300. A written scope of work for vapor recovery installation should include? -
(ANSWER)Construction plans
Positive shut off overfill protection device must stop the flow of fuel when the tank is no more then ? -
(ANSWER)95% full
CORRECT DETAILED ANSWERS WITH RATIONALES|AGRAD
July 1 2005, service techs shall possess or work under someone who has a current certification indicating
he or she has passed the ? -(ANSWER)California UST service technician exam
ICC cert must be renewed every? -(ANSWER)24 months
Service techs must posses or be employed by a person who has the appropriate contractors license
unless? -(ANSWER)The individual has a Tank testing licens
Service tech is defined by any individual who? -(ANSWER)Test UST monitoring equipment
Trouble shoots UST systems
Installs UST monitoring equipment
If the manufacturer training no longer exist , the local angency may? -(ANSWER)Approve comparable
alternat training .
UST includes? -(ANSWER)Tank and connected piping
What is considered and UST -(ANSWER)petroleum storage tank
What UST system meets the requirements for secondary containment? -(ANSWER)Doubled wall tanks
According to title 23; the following piping components if installed after July 1 1987 must have secondary
containment -(ANSWER)Pressured product piping
Considered "pipe" on tanks installed after July 1 2003 -(ANSWER)Pressured product piping and below
ground vapor recovery
, CALIFORNIA UST SERVICE TECHNICIAN PART 1 EXAM ACTUAL EXAM QUESTIONS AND
CORRECT DETAILED ANSWERS WITH RATIONALES|AGRAD
Under dispenser containment (UDC) was required for all UST systems by -(ANSWER)December 31 2003
System for exchanging gas vapors in a storage tank and product in a fuel delivery truck -(ANSWER)Stage
1 vapor recovery
An approved method for non visual monitoring for existing UST systems. -(ANSWER)Statistical Inventory
Reconciliation (SIR)
ATG must be capable for detecting a release of ? -(ANSWER).2 gallons per hour
Manual inventory reconciliation. -(ANSWER)No longer an approved method for non visual monitoring on
existing UST systems
Automatic line leak detectors installed on underground piping with secondary containment shall be
capable of tetecting a leak of ? -(ANSWER)3 gallons per hour at 10 psi
ATG should be programmed to test the tank ? -(ANSWER)At least monthly
According to PEI RP 300 a combustible gas can be used to ? -(ANSWER)Detect vapor leaks in a vapor
recovery system.
According to PEI RP 300. A written scope of work for vapor recovery installation should include? -
(ANSWER)Construction plans
Positive shut off overfill protection device must stop the flow of fuel when the tank is no more then ? -
(ANSWER)95% full