According to the AIA, what is the warranty that a contractor shall
provide for his correct answersOne
workmanship?
year
According to AIA A201, within how many days must the contractor notify
the architect
after they notice a hidden condition that varies material from what was
specifieddocuments?
contract in the correct answers14
days
After contract negotiations concluded between the owner and architect,
the architect performs the required site inspections and presents bill for
owner
$750 for then
hisrequest anThe
services. additional inspection to be performed at the site.
The architect
presents an additional bill for $750 for performance of the additional
the additional
inspection. inspection, the architect finds a failure of compliance. How
During
reimburse?
much does GC correct answers$1500. The contractors responsible to pay all
related
tests andcost of
approvals as required by the contract documents and is thus
responsible
the $750 fee. forHowever, the cost for any test that is requested once contract
negotiations
between the owner and contractors completed is a responsibility of the
owner.
the contractor
Becausefailed the test the additional $750 fee is the
responsibility of the
contracto
r.
In a project where architects, engineers, contractors, and subcontractors
are involved,
who is generally responsible for the building permits? correct
answersContractor
What are shop drawings, product data and samples considered, according
to the AIA?
correct answersNot contract
documents
According to the AIA, what is a construction change directive? correct
order, prepared by the architect and signed by the owner and
answersWritten
architect
According to the AIA 201, Blank will not be included by the architect for
the costdirective?
change of a correct answersHand tool
rental cost
According to the AIA documents, when can the contractor see payment for
his retainage
amount? correct answersUpon issuance of the certificate of substantial
completion
If a contractor is required to provide submittals in accordance with
the contract then the contractor shall not perform that portion of the work
documents,
until Blank?
correct answersThe submittal has been approved by the
architect
Which of the following is not a cause for an architect to withhold a
certificate correct
payment? of answersDamage done by the owner to the
contractor
, Partial occupancy does not constitute acceptance of noncompliant work in
that portion
occupied, unless otherwise agreed, true or false? correct
answersTrue
After the approval of the contractor certification for payment by the
architect,
be what shall
done? correct answersThe owner should make the
payment
In the event of a disagreement between the IDM over the additional cost
for a change
directive, according to AIA, what should the contractor do if the work has
already
on begun
a project and the owner is making payments as per the signed
contract? correct contract performance pending final resolution of
answersContinue
arbitration
AIA A201 is an agreement between two parties, the owner and the
Blank? correct
answersContract
or
When a project is completed, who gets the plans and drawings? correct
owne
answersThe
r
A change order must be signed by? correct answersThe contractor,
owner, and
archite
ct
What should a change order contained? correct answersChanging the work,
the contract amount, time and
changing
adjustment
If a contractor knows that the engineers plans are not in compliance with
the current
building code, but builds according to those anyway, who is
responsible? correct
answersContract
or
According to the AIA, which of the following is included in the
original contract
documents, besides the agreement and conditions of the contract
supplementary, and other conditions)? correct answersDrawings,
(general,
specifications
addendum and prior to the execution of the
issued
contract
GC construction equipment delivery was delayed due to the breakdown
of shipping truck. The delay was six days. GC construction is entitled for
companies
blank for the
said delay. correct answersA reasonable time extension is determined by
the architect
According to AIA 401 which of the following factors may not be used to
reduce the
amount of a subcontractor progress payment? correct answersThe amount,
if any,that
work for remains uncorrected for which the contractors previously held
certificate
withheld a of payment as provided an article 9 of AIA 8201 for a cause that is
the fault of
contractor.
According to AIA 401, prior to the first application for payment,
subcontractor
what should a submit to the contractor? correct answersA schedule
of values