agile scrum mock test with accurate
solutions
Which does a self-organizing Development Team choose? - ANS-How to best
accomplish its work
Who should know the most about the project performance? - ANS-The Product Owner
How much of the Sprint Backlog should be defined during the Sprint Planning meeting?
- ANS-not_ All of the potential work.
OR-- Just enough for the Scrum Master to be able to assign tasks to developers
How is a Product Backlog ordered? - ANS-Based on the value of the items
When is a Sprint canceled? - ANS-When the Product Owner determines it makes no
sense to finish it
The Scrum Master should cancel the Sprint Planning, if the Sprint Goal is not composed
beforehand. - ANS-False
Who estimates the work during the Sprint? - ANS-not- The Scrum Master
The Development Team
Who can replace Sprint Backlog items during the Sprint? - ANS-not- No one
OR. The Development Team
The Sprint Review is: - ANS-not- An opportunity for reviewing the viability of the project
An opportunity for inspection and adaptation
The Sprint Backlog should not change after the Sprint Planning. - ANS-False
What should be done between a Sprint Retrospective and the next Sprint Planning? -
ANS-not- Refactor the developed items
Nothing; there's no time between the two.
Which of the following is the subject of Sprint Retrospective? - ANS-Scrum process
, When the Scrum Team becomes mature enough, it doesn't need a Scrum Master
anymore. - ANS-False
Scrum does not have a role called "project manager." - ANS-True
When is a Sprint Backlog item considered complete? - ANS-When everything is done
based on the Definition of Done
The Product Owner determines the number of items that should be selected for each
Sprint. - ANS-False
Which two of the following are true about the Product Owner? - ANS-not--
Is accountable for prioritizing the Product Backlog items
Can be influenced by a committee
What's the timebox for a complete Sprint Planning meeting? - ANS-8 hours for a one
month Sprint
Which of the following should be done during the Sprint Review? (Multiple answers) -
ANS-not-- Demonstration of the Increment
Discussion of the Scrum process, and how it was used during the Sprint
_______________________________
Demonstration of the Increment
Communication of the project progress
What's the vertical axis in a typical burn-down chart? - ANS-not-- The capacity of the
team
The amount of remaining work
What's the main responsibility of testers? - ANS-not-- They verify the programmers
output
There's no tester role in Scrum
Items at the bottom of the Product Backlog are usually larger than those on the top. -
ANS-True
Who determines how work is performed during the Sprint? - ANS-The Development
Team
solutions
Which does a self-organizing Development Team choose? - ANS-How to best
accomplish its work
Who should know the most about the project performance? - ANS-The Product Owner
How much of the Sprint Backlog should be defined during the Sprint Planning meeting?
- ANS-not_ All of the potential work.
OR-- Just enough for the Scrum Master to be able to assign tasks to developers
How is a Product Backlog ordered? - ANS-Based on the value of the items
When is a Sprint canceled? - ANS-When the Product Owner determines it makes no
sense to finish it
The Scrum Master should cancel the Sprint Planning, if the Sprint Goal is not composed
beforehand. - ANS-False
Who estimates the work during the Sprint? - ANS-not- The Scrum Master
The Development Team
Who can replace Sprint Backlog items during the Sprint? - ANS-not- No one
OR. The Development Team
The Sprint Review is: - ANS-not- An opportunity for reviewing the viability of the project
An opportunity for inspection and adaptation
The Sprint Backlog should not change after the Sprint Planning. - ANS-False
What should be done between a Sprint Retrospective and the next Sprint Planning? -
ANS-not- Refactor the developed items
Nothing; there's no time between the two.
Which of the following is the subject of Sprint Retrospective? - ANS-Scrum process
, When the Scrum Team becomes mature enough, it doesn't need a Scrum Master
anymore. - ANS-False
Scrum does not have a role called "project manager." - ANS-True
When is a Sprint Backlog item considered complete? - ANS-When everything is done
based on the Definition of Done
The Product Owner determines the number of items that should be selected for each
Sprint. - ANS-False
Which two of the following are true about the Product Owner? - ANS-not--
Is accountable for prioritizing the Product Backlog items
Can be influenced by a committee
What's the timebox for a complete Sprint Planning meeting? - ANS-8 hours for a one
month Sprint
Which of the following should be done during the Sprint Review? (Multiple answers) -
ANS-not-- Demonstration of the Increment
Discussion of the Scrum process, and how it was used during the Sprint
_______________________________
Demonstration of the Increment
Communication of the project progress
What's the vertical axis in a typical burn-down chart? - ANS-not-- The capacity of the
team
The amount of remaining work
What's the main responsibility of testers? - ANS-not-- They verify the programmers
output
There's no tester role in Scrum
Items at the bottom of the Product Backlog are usually larger than those on the top. -
ANS-True
Who determines how work is performed during the Sprint? - ANS-The Development
Team