Your installation is refurbishing an existing PES facility built in 1968. Do you need to complete an
ESSP?
Ans: Yes, and it requires DDESB approval.
As distance from the potential explosion site decreases, the potential for damage to an exposed site
from an explosion....
Ans: increases.
Your installation is increasing the NEW for a storage site built in 1969 and storing a hazard division
that was not previously approved for that location. Do you need to complete an ESSP?
Ans: Yes, and it requires DDESB approval.
Intraline distance (ILD) is the minimum distance permitted between...
Ans: two operating buildings.
The purpose of an ESSP is to ensure safety, provide specifications, and...
Ans: establish limits.
You must submit an ESSP for DDESB approval if the installation is...
Ans: building an ES within an existing ESQD arc.
Failing to submit a successful ESSP may result in...
Ans: reduced operational capacity.
Which are the phases of the ESSP process in order?
Ans: Development and Evaluation, Submission, DDESB Review, and Implementation.
The Expedited Approval Request must...
US Army Explosive Safety Familiarization
Questions with Detailed Verified Answers
(100% Correct Answers) /Already Graded
A+
Your installation is refurbishing an existing PES facility built in 1968. Do you need to complete an
ESSP?
Ans: Yes, and it requires DDESB approval.
As distance from the potential explosion site decreases, the potential for damage to an exposed site
from an explosion....
Ans: increases.
Your installation is increasing the NEW for a storage site built in 1969 and storing a hazard division
that was not previously approved for that location. Do you need to complete an ESSP?
Ans: Yes, and it requires DDESB approval.
Intraline distance (ILD) is the minimum distance permitted between...
Ans: two operating buildings.
The purpose of an ESSP is to ensure safety, provide specifications, and...
Ans: establish limits.
You must submit an ESSP for DDESB approval if the installation is...
Ans: building an ES within an existing ESQD arc.
Failing to submit a successful ESSP may result in...
Ans: reduced operational capacity.
Which are the phases of the ESSP process in order?
Ans: Development and Evaluation, Submission, DDESB Review, and Implementation.
The Expedited Approval Request must...