Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

Minnesota Special Engineer Boiler License Exam (2025 / 2026 New Update) | Questions and Verified Answers | 100% Correct | Already Graded A

Document preview thumbnail
Preview 2 out of 11 pages

Minnesota Special Engineer Boiler License Exam (2025 / 2026 New Update) | Questions and Verified Answers | 100% Correct | Already Graded A

Content preview

1|Page



Minnesota Special Engineer Boiler License Exam
( New Update) | Questions and Verified
Answers | 100% Correct | Already Graded A
A Special Engineer is expected to be competent, take charge of, and be
responsible for the safe operation and maintenance of all classes of boilers of not
more than ___________ HP and their appurtenances. - (answers)50



A gauge glass can be attached to a ____________ column, which is attached to a
boiler. - (answers)water



In accordance with the statutes of the State of Minnesota, one boiler horsepower
for conventional boilers is equal to ____________ - (answers)10 sq ft of boiler
heating surface



In accordance with the statutes of the State of Minnesota, one boiler horsepower
for steam-coil-type generators is equal to ____________ - (answers)5 sq ft of
boiler heating surface



When the boiler heating surface cannot be discerned, the boiler horsepower shall
be determined by dividing the Btu input by ____________ - (answers)67,000



In accordance with the statues of the State of Minnesota, each electric boiler
horsepower is equal to ____________ kilowatts - (answers)10



A logbook must be maintained in the boiler room by the ____________ -
(answers)the chief engineer or the operating engineer designee

, 2|Page




The shift engineer of a high pressure boiler plant of over 200 HP must stay within
____________ of boiler room at all times during the shift? - (answers)500 ft



A high pressure boiler must have two means of feedwater supply if it exceeds
____________ HP. - (answers)50



When used, a quick-opening blowdown valve must be located ____________ -
(answers)nearest to the boiler



The minimum passing score for a Minnesota engineer's license examination is
____________% - (answers)70



Licenses granted must be displayed in ____________ - (answers)a conspicuous
place in the engine or boiler room



For the purpose of the boiler and pressure vessels statutes, "a year" is considered
to be at least ____________ hr. - (answers)2000



Sensible heat is ____________ - (answers)able to cause a change in temperature



Heat that brings about of state without causing a change in temperature is
____________ - (answers)called latent heat

Document information

Uploaded on
March 24, 2025
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
Free
Download

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
498
Followers
2
Items
3046
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions