Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 3 pages
Exam (elaborations)

IMSA level 1 Certification

Document preview thumbnail
Preview 1 out of 3 pages

Where are you when you install alternating flashing 12" red lights? - Correct Ans-At a railroad crossing. Who determins the the standards on traffic control devices and sets the requirements for uniformity? - Correct Ans-The Manual on uniform traffic control devices, (MUTCD). What is the the voltage that a traffic signal cabinet needs to run all its components? - Correct Ans-120 volts AC Where are you when you come across a signal that has a ped pole on each side of the road, each having a 3 section signal on top followed with a 2 section mounted directly under neath? - Correct Ans-A ramp meter on a ramp to a highway. What is a flashing signal along the road called? - Correct Ans-A flashing beacon. What is the definition of short term work zone as per the MUTCD? - Correct Ans-1 hour or less What's OSHA? - Correct Ans-Occupational and safety health administration Can you get your level III certification and what are they? - Correct Ans-Yes, and it's for bench and field electrician I'm working near power lines where would I get my clearance from? - Correct Ans-CEC, NEC, NESC What are the three basic types of beacons? - Correct Ans-Stop sign beacon, warning beacon, and flashing beacon. What is the difference between concurrent and sequential phases? - Correct Ans-Concurrent phases, phases that run together. Sequential phases, are phases that run one at a time. I have a dual ring controller and all my through phases are even, what do I mean? - Correct Ans-The dual ring phases are 2,4,6,8 What is the cheapest way to coordinate a corridor of signals? What needs to stay the same throughout the day? - Correct Ans-Time based coordination, and cycle length. Explain the white walking man, the flashing orange hand on a ped head and how is this time figured? - Correct Ans-The white walking man is the ped head walk interval, and the ped change clearance interval is the flashing orange hand. What makes up the green interval? - Correct Ans-Initial green time, passage/extension/gap time, and max green time. At most intersections what are phases 2,6 called, and phases 4,8 called - Correct Ans-Phases 2,6 are called Main Street, and 4,8 are called side street. Name the three traffic signal systems? - Correct Ans-Closed loop, central computer, hybrid systems. If phase 2 is in recall what will the controller do? - Correct Ans-The controller will service that phase even if there is no need for it. What happens after the green interval and before the red interval, and how is this change interval figured? - Correct Ans-Yellow interval, and is figured by using the approach speed of the traffic. What is an offset? - Correct Ans-The time it takes from the start of the green interval in a coordination timed intersection and a system reference point along side the road. The controller in a coordinated plan has a call on the side street what can it do to service that call? - Correct Ans-It can use the force off command to end the current phase to service the side street. What is the disadvantage of a span intersection? - Correct Ans-Taller support poles. What is the disadvantage of mast arm supports? - Correct Ans-Higher cost. What is the minimum number is heads for Main Street direction? - Correct Ans-Must have a minimum of 2 signal heads. 12" signal heads can be used without side a pole support heads on a ____ to a _____ intersection? - Correct Ans-Minimum 40 foot maximum 120 foot intersection. The a.d.a of 1990 ensures no discrimination against people who have disabilities? - Correct Ans-True. Are pull/ junction boxes only used where wire needs to change direction? - Correct Ans-No What is used to shade signal indications from the sun and allow it be seen from the lane intended? - Correct Ans-Visors. Signal heads that are _________ are to only be seen from a specific area on the road? - Correct Ans-Visibility limited. ____ assemblies provid

Content preview

IMSA



IMSA level 1 Certification

Where are you when you install alternating flashing 12" red lights? - Correct Ans-At a
railroad crossing.

Who determins the the standards on traffic control devices and sets the requirements
for uniformity? - Correct Ans-The Manual on uniform traffic control devices, (MUTCD).

What is the the voltage that a traffic signal cabinet needs to run all its components? -
Correct Ans-120 volts AC

Where are you when you come across a signal that has a ped pole on each side of the
road, each having a 3 section signal on top followed with a 2 section mounted directly
under neath? - Correct Ans-A ramp meter on a ramp to a highway.

What is a flashing signal along the road called? - Correct Ans-A flashing beacon.

What is the definition of short term work zone as per the MUTCD? - Correct Ans-1 hour
or less

What's OSHA? - Correct Ans-Occupational and safety health administration

Can you get your level III certification and what are they? - Correct Ans-Yes, and it's for
bench and field electrician

I'm working near power lines where would I get my clearance from? - Correct Ans-CEC,
NEC, NESC

What are the three basic types of beacons? - Correct Ans-Stop sign beacon, warning
beacon, and flashing beacon.

What is the difference between concurrent and sequential phases? - Correct Ans-
Concurrent phases, phases that run together. Sequential phases, are phases that run
one at a time.

I have a dual ring controller and all my through phases are even, what do I mean? -
Correct Ans-The dual ring phases are 2,4,6,8

What is the cheapest way to coordinate a corridor of signals? What needs to stay the
same throughout the day? - Correct Ans-Time based coordination, and cycle length.

Explain the white walking man, the flashing orange hand on a ped head and how is this
time figured? - Correct Ans-The white walking man is the ped head walk interval, and
the ped change clearance interval is the flashing orange hand.

IMSA

Document information

Uploaded on
March 24, 2025
Number of pages
3
Written in
2024/2025
Type
Exam (elaborations)
Contains
Unknown
$5.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AlexScorer
2.5
(2)
Sold
11
Followers
0
Items
1800
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions