MCPPO Design and Construction UPDATED ACTUAL Exam Questions and CORRECT Answers

Document preview thumbnail
Preview 3 out of 21 pages

MCPPO Design and Construction UPDATED ACTUAL Exam Questions and CORRECT Answers What are the three stages of the design and construction process for public construction projects in MA - CORRECT ANSWER - Planning, Design, and Construction What does the design stage result in? - CORRECT ANSWER and specifications describing the project to be built. - A complete set of plans What happens after a set of plans and specifications is complete? - CORRECT ANSWER Bids are solicited on the completed design, and the selected contractor completes the

Content preview

MCPPO Design and Construction
UPDATED ACTUAL Exam Questions and
CORRECT Answers
What are the three stages of the design and construction process for public construction projects
in MA - CORRECT ANSWER - Planning, Design, and Construction



What does the design stage result in? - CORRECT ANSWER - A complete set of plans
and specifications describing the project to be built.


What happens after a set of plans and specifications is complete? - CORRECT ANSWER -
Bids are solicited on the completed design, and the selected contractor completes the
construction stage.


Who is always responsible and accountable for the project? - CORRECT ANSWER -
Public Owner (Awarding Authority)


Before contracting for design services in connection with a public building contract estimated to
cost $1.5 million or more, your jurisdiction is required to do what? - CORRECT
ANSWER - Contract with or assign an Owner's Project Manager (OPM)


Serves as your jurisdiction's agent during the planning, design, and implementation of the
construction work. - CORRECT ANSWER - OPM


Independent of the project designer, general contractor, or any subcontractor. - CORRECT
ANSWER - OPM


I you elect to contract for the services of an OPM, what are you required to do? - CORRECT
ANSWER - Use a qualifications-based selection process, which means that the OPM must
be competitively selected on the basis of qualifications, without price competition.

,Can you assign an employee to serve as OPM? - CORRECT ANSWER - Yes, if the
employee meets or exceeds the requirements and has building construction and supervision
experience relating to projects of similar size and scope of complexity.


What is a study? - CORRECT ANSWER - A pre-design document that:


-Confirms and explains the owner's requirements
-Identifies and evaluates alternative solutions
-Recommends and defines a solution


Purpose is to identify the owner's needs and determine the most appropriate and cost effective
solution to meeting the needs. - CORRECT ANSWER - Study



True or False: A study may not result in a construction project. - CORRECT ANSWER -
True


More refined and detailed than the conceptual drawings that were included in the study. Includes
floor plans, side views, and other illustrations. - CORRECT ANSWER - Schematic
drawings


At the end of this phase, the designer should prepare and submit to the owner a revised
construction cost estimate. - CORRECT ANSWER - Schematic Design Phase


Consists of plans and specifications that are between 10 percent and 30 percent complete.
Presented to the owner as a deliverable. - CORRECT ANSWER - Schematic Design


Once the owner approves the schematic design documents, the project may proceed to this
phase.... - CORRECT ANSWER - Design Development


In this phase, the designer further refines the drawings and written specifications by filling in
construction details and incorporating changes in response to the owner's review of the schematic

, design as well as changes required by a regulatory agency. - CORRECT ANSWER -
Design Development


In this phase, the design will be completed by filling in the final details - CORRECT
ANSWER - Construction Documents


The deliverable of this design phase will be the 100 percent complete design documents that will
form the legal basis of the construction contract. - CORRECT ANSWER - Construction
Documents


Must be written to provide for full competition for each item of material to be furnished under
the contract - CORRECT ANSWER - Material Specifications


Specifications that restrict competition to fewer than three manufacturers or producers may be
used only for__________________________________ - CORRECT ANSWER - "Sound
Reasons in the Public Interest"


If you use restrictive or proprietary specifications for an item, the specifications for that item
must include ___________________________ - CORRECT ANSWER - An "Or Equal"
Clause


A provision allowing bidders to furnish items that are equal to the specified item. - CORRECT
ANSWER - "Or Equal" Clause


For every item in materials specification, the specs must name _____________________ -
CORRECT ANSWER - -Minimum of three brands of materials or provide a material
description that can be met by at least three manufacturers or producers.


The owner should take what steps before soliciting applications for design services for building
projects and for public works projects. - CORRECT ANSWER - -Prepare a complete and
detailed scope of work
-Identify the basis of compensation

Document information

Uploaded on
March 22, 2025
Number of pages
21
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STANFORDGRADESS
4.0
(239)
Sold
1595
Followers
108
Items
115164
Last sold
1 hour ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions