GCSS-ARMY MAST COURSE TEST 1
QUESTIONS WITH ACTUAL
SOLUTIONS.
1. In the Equipment Situation Report, what button is used to display the Functional
bb bb bb bb bb bb bb bb bb bb bb bb bb
Location Structure for a selected piece of equipment? - ANSWER: c.
bb bb bb bb bb bb bb bb bb bb bb
2. What status is used to indicate the severity of a notification in the Equipment
bb bb bb bb bb bb bb bb bb bb bb bb bb bb
Situation Report? - ANSWER: b. Technical Status
bb bb bb bb bb bb bb
3. The ______ field is used to enter the odometer reading or the meter reading
bb bb bb bb bb bb bb bb bb bb bb bb bb bb
when entering equipment usage incurred during a dispatch. - ANSWER: a.
bb bb bb bb bb bb bb bb bb bb bb
Rdg/CtrRdg
bb
4. When must you obtain an approval for a Dispatch (D1) notification from an
bb bb bb bb bb bb bb bb bb bb bb bb bb
approving authority? - ANSWER: d. All of the above require an approval
bb bb bb bb bb bb bb bb bb bb bb bb
5. The ______ notification type is used to create equipment dispatches in mass for
bb bb bb bb bb bb bb bb bb bb bb bb bb
an Alert. - ANSWER: c. D2
bb bb bb bb bb bb
6. The ______ notification type is used when maintenance is required on a piece
bb bb bb bb bb bb bb bb bb bb bb bb bb
of equipment. - ANSWER: c. M1
bb bb bb bb bb bb
7. The ______ work order type is created from a maintenance notification. -
bb bb bb bb bb bb bb bb bb bb bb bb
ANSWER: b. PM01
bb bb bb
8. The ______ transaction is used to create a project work order? - ANSWER: c.
bb bb bb bb bb bb bb bb bb bb bb bb bb bb
IW31
bb
9. In the Inbound Delivery Monitor, the Purchasing Document number that begins
bb bb bb bb bb bb bb bb bb bb bb
with the prefix 71 indicates ______. - ANSWER: a. The purchasing document is
bb bb bb bb bb bb bb bb bb bb bb bb bb
an SSA filled order
bb bb bb bb
10. A Maintenance Call uses ______ to generate a notification for a service that is
bb bb bb bb bb bb bb bb bb bb bb bb bb bb
due for processing. - ANSWER: b. The established maintenance plan counter
bb bb bb bb bb bb bb bb bb bb bb
requirements, date requirements, and parameter settings
bb bb bb bb bb bb
11. Service schedules that are due will have an associated ______ created. -
bb bb bb bb bb bb bb bb bb bb bb bb
ANSWER: c. Notification
bb bb bb
QUESTIONS WITH ACTUAL
SOLUTIONS.
1. In the Equipment Situation Report, what button is used to display the Functional
bb bb bb bb bb bb bb bb bb bb bb bb bb
Location Structure for a selected piece of equipment? - ANSWER: c.
bb bb bb bb bb bb bb bb bb bb bb
2. What status is used to indicate the severity of a notification in the Equipment
bb bb bb bb bb bb bb bb bb bb bb bb bb bb
Situation Report? - ANSWER: b. Technical Status
bb bb bb bb bb bb bb
3. The ______ field is used to enter the odometer reading or the meter reading
bb bb bb bb bb bb bb bb bb bb bb bb bb bb
when entering equipment usage incurred during a dispatch. - ANSWER: a.
bb bb bb bb bb bb bb bb bb bb bb
Rdg/CtrRdg
bb
4. When must you obtain an approval for a Dispatch (D1) notification from an
bb bb bb bb bb bb bb bb bb bb bb bb bb
approving authority? - ANSWER: d. All of the above require an approval
bb bb bb bb bb bb bb bb bb bb bb bb
5. The ______ notification type is used to create equipment dispatches in mass for
bb bb bb bb bb bb bb bb bb bb bb bb bb
an Alert. - ANSWER: c. D2
bb bb bb bb bb bb
6. The ______ notification type is used when maintenance is required on a piece
bb bb bb bb bb bb bb bb bb bb bb bb bb
of equipment. - ANSWER: c. M1
bb bb bb bb bb bb
7. The ______ work order type is created from a maintenance notification. -
bb bb bb bb bb bb bb bb bb bb bb bb
ANSWER: b. PM01
bb bb bb
8. The ______ transaction is used to create a project work order? - ANSWER: c.
bb bb bb bb bb bb bb bb bb bb bb bb bb bb
IW31
bb
9. In the Inbound Delivery Monitor, the Purchasing Document number that begins
bb bb bb bb bb bb bb bb bb bb bb
with the prefix 71 indicates ______. - ANSWER: a. The purchasing document is
bb bb bb bb bb bb bb bb bb bb bb bb bb
an SSA filled order
bb bb bb bb
10. A Maintenance Call uses ______ to generate a notification for a service that is
bb bb bb bb bb bb bb bb bb bb bb bb bb bb
due for processing. - ANSWER: b. The established maintenance plan counter
bb bb bb bb bb bb bb bb bb bb bb
requirements, date requirements, and parameter settings
bb bb bb bb bb bb
11. Service schedules that are due will have an associated ______ created. -
bb bb bb bb bb bb bb bb bb bb bb bb
ANSWER: c. Notification
bb bb bb