• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 39 pages
Exam (elaborations)

CDFM Module 2.2 Questions with verified answers

Document preview thumbnail
Preview 4 out of 39 pages

CDFM Module 2.2 Questions with verified answers

Content preview

CDFM Module 2.2 Questions with verified answers
"BOTTOM-UP" method of cost analysis that is the most detailed of all techniques
and the most costly to implement. Ans✓✓✓ Engineeting Approach


A contractors WBS looks like a company organization chart, however it includes
the _____ and _____ that constitute the program rather than the organization
Ans✓✓✓ Product and Services


A critical aspect of _____ is the periodic reporting requirement associated with
the management tool. Periodic report -normally required on a monthly basis.
Ans✓✓✓ EVM


A line graph formed by connecting the frequency of the values (connecting dots)?
Ans✓✓✓ Frequency Polygon


A number between -1 and 1 which measures the degree to which variables are
linearly related. Closer to 1 or -1 the better the relationship? Ans✓✓✓
Correlation Coefficient


A statement of equality between two categories. Ans✓✓✓ Proportion
(Inferential Statistics)


A successful Milestone B decision allows entry into what phase of the Acquisition
Life Cycle? Ans✓✓✓ Engineering and Manufacturing Development (EMD)


A successful Milestone C decision allows entry into what phase of the Acquisition
Life Cycle? Ans✓✓✓ Production and Deployment

,A sufficient ___________ ensures the best, most affordable alternative solution
selected from among the potential solution. Ans✓✓✓ AoA


ACAT 1 programs have a total expenditure of? Ans✓✓✓ RDT&E - $365M; or
Procurement of greater than $2.19B (in FY2000 constant dollars)


ACAT 1A have a total expenditure of: Ans✓✓✓ Must meet one or more of the
following:
1 - Program cost for any single year in excess of $32M
2 - total program costs in excess of $216M
3 - total life-cycle costs in excess of $378M


ACAT 1AM and ACAT 1AC are? Ans✓✓✓ Major Automated Information Systems
(MAIS)


Acquisition 1A programs are broken out into what two subcategories? Ans✓✓✓
ACAT 1AM - MDA at the DoD level
ACAT 1AC - MDA at the component level


Acquisition Category 1 (ACAT 1) are broken down into two subcategories?
(Designated by USD(AT&L)) Ans✓✓✓ 1. ACAT 1D (MDA is at DoD level)
2. ACAT 1C (MDA is at Component level)

,Acquisition programs are categorized into acquisition categories. The categories
are established to determine: Ans✓✓✓ Level of management review, decision
authority, reporting requirements


Actual performance of a task, which consumes time and requires resources (such
as labor, materials, space and equipment)? Ans✓✓✓ Activity


After several months of contract performance, a determination can be made to
see if the schedule and cost variance will be favorable or unfavorable by
performing a? Ans✓✓✓ Trend Analysis


An AoA is required for what type of acquisition programs? Ans✓✓✓ ACAT 1 and
ACAT 1A


An approved pre-system acquisition by the Milestone Decision Authority (MDA)
will continue to its next progression called the? Ans✓✓✓ Systems Acquisition:
1. Engineering and Manufacturing Development (EMD)
2. Production and Deployment


An economic analysis is prepared using a _____ ______ ____ basis? Ans✓✓✓
Net Present Value (NPV)


An evolutionary acquisition approach delivers capability in __________,
recognizing the need for future __________ improvements. Ans✓✓✓
Increments, Capability


Are bar graphs in which the frequencies are represented by the length of the
bars? Ans✓✓✓ Histogram

, As required by DoD 5000 series, a _____ shall be prepared for all ACAT I and ACAT
IA programs. Ans✓✓✓ CARD


Assume a normal distribution, mean = 50, standard deviation = 10, what percent
of the data is greater than 40?


68%, 84%, 16%, impossible to tell Ans✓✓✓ 84%


At what point in the life of an acquisition program have usable end-items been
produced and a significant portion have been deployed? Ans✓✓✓ Sustainment


BCWP ACWP
$216 $122 Ans✓✓✓ FAVORABLE


BCWP ACWP
$439 $564 Ans✓✓✓ UNFAVORABLE


BCWS BCWP
$719 $847 Ans✓✓✓ FAVORABLE


BCWS BCWP
$883 $684 Ans✓✓✓ UNFAVORABLE


Because of _______, benefits and costs that occur in future years are worth less
than those that occur earlier Ans✓✓✓ Inflation

Document information

Uploaded on
March 21, 2025
Number of pages
39
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
cracker
3.8
(402)
Sold
2185
Followers
1346
Items
50168
Last sold
6 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions