Vivint Smart Home Pro Final Exam -REAL ACTUAL EXAM-LATEST
UPDATE-COMPLETE QUESTIONS AND ANSWERS | RATED 100%
CORRECT | ALREADY GRADED A+
What is the input voltage range of the Doorbell Cam? - (answers)12-24v
What is the output voltage of the transformer used to power the SkyControl panel? -
(answers)16.5 VAC
True or False: When programming a sensor into the sky panel you can type in the serial
number or "learn" it in by triggering the device - (answers)true
When programming a DW21, which loop number is used?
1
2
3 - (answers)2
Which of the following materials can you use to group multiple ground terminals in a
takeover module:
Solder
String
Wire Caps
Duct Tape
Beans - (answers)beans and wire caps
T or F: When installing the firefighter, it is required to test the customer's existing smoke
detectors - (answers)True
When installing a DW21, what size bit should you use to drill the hole for the sensor?
1/2"
3/8"
, 3/4"
1" - (answers)3/4"
T or F: When installing the TAKE-345, you must ensure that the transformer is supplying
power to the power supply before the battery. - (answers)True
T or F: You are required to test signals from all secondary keypads and key fobs even though
they are not detection devices - (answers)True
T or F: When running power to the TAKE-345 polarity does not apply - (answers)False
What is the correct height at which to install the PIR2?
7 ft
At least 5 ft
At least 7 ft
At 7.5 ft - (answers)
- (answers)How would you program a CO3 if mounted on a hallway wall?
Loop 1 Zone 8
Loop 1 Zone 14
Loop 3 Zone 4
Loop 1 Zone 4
- (answers)When installing a DW21 into a metal door frame, with a wooden door, what
should you be sure to use?
Metal Drill bit
A DW11 should be used on all metal door frames
3/4" insulated magnet
Eye goggles
UPDATE-COMPLETE QUESTIONS AND ANSWERS | RATED 100%
CORRECT | ALREADY GRADED A+
What is the input voltage range of the Doorbell Cam? - (answers)12-24v
What is the output voltage of the transformer used to power the SkyControl panel? -
(answers)16.5 VAC
True or False: When programming a sensor into the sky panel you can type in the serial
number or "learn" it in by triggering the device - (answers)true
When programming a DW21, which loop number is used?
1
2
3 - (answers)2
Which of the following materials can you use to group multiple ground terminals in a
takeover module:
Solder
String
Wire Caps
Duct Tape
Beans - (answers)beans and wire caps
T or F: When installing the firefighter, it is required to test the customer's existing smoke
detectors - (answers)True
When installing a DW21, what size bit should you use to drill the hole for the sensor?
1/2"
3/8"
, 3/4"
1" - (answers)3/4"
T or F: When installing the TAKE-345, you must ensure that the transformer is supplying
power to the power supply before the battery. - (answers)True
T or F: You are required to test signals from all secondary keypads and key fobs even though
they are not detection devices - (answers)True
T or F: When running power to the TAKE-345 polarity does not apply - (answers)False
What is the correct height at which to install the PIR2?
7 ft
At least 5 ft
At least 7 ft
At 7.5 ft - (answers)
- (answers)How would you program a CO3 if mounted on a hallway wall?
Loop 1 Zone 8
Loop 1 Zone 14
Loop 3 Zone 4
Loop 1 Zone 4
- (answers)When installing a DW21 into a metal door frame, with a wooden door, what
should you be sure to use?
Metal Drill bit
A DW11 should be used on all metal door frames
3/4" insulated magnet
Eye goggles