• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 14 pages
Exam (elaborations)

BCN3761 MIDTERM Exam 84 complete solutions.

Document preview thumbnail
Preview 2 out of 14 pages

BCN3761 MIDTERM Exam 84 complete solutions. BCN3761 MIDTERM Exam 84 complete solutions. BCN3761 MIDTERM Exam 84 complete solutions. BCN3761 MIDTERM Exam 84 complete solutions.

Content preview

BCN3761 MIDTERM Exam 84 complete
solutions.
BCN3761 MIDTERM Exam 84 complete
solutions.
What are the three basic types of documents used in construction contracts?

a. Bidding and Contract Requirements

b. Drawings

c. Specifications

d. Marketing data - ANSWER a. bidding and contract req.

b. drawings

c. specifications



which of the following are included in the bidding documents but not in the construction contract
documents?

a. Instructions to Bidders

b. General Conditions of the Contract

c. Agreement Form

d. Bid Form - ANSWER a. instruction to bidders

d. bid form



T/F; specifications describe the construction in text form - ANSWER true



T/F; construction specifications apply only to the construction phase of a project - ANSWER false



T/F; development of construction specifications for a project begins during the contract document
phase - ANSWER false



T/F; procurement documents include construction specifications - ANSWER true

, BCN3761 MIDTERM Exam 84 complete
solutions.
T/F; design-bid-build and design-build two valid method to procure a construction project - ANSWER
true



T/F; contract documents are identified in the agreement for a construction project - ANSWER true



T/F; drawing are the graphic description of the work to be performed by the contractor - ANSWER true



the agreement included which of the following for the construction contract?

a. Summary of the work to be performed by the Contractor

b. Time within which work shall be completed

c. Amount of money to be paid by Owner to Contractor

d. All of the above - ANSWER a. summary of work to be performed by the contractor,



b. time within work shall be completed



c. amount of money to be paid by owner



d. All of the above



T/F; the purpose of the drawings and specifications is to communicate information between the
architect/engineer and the contractor - ANSWER true



T/F; the term 'work' is defined in the general conditions of the contract - ANSWER true



the contract drawings designate which of the following relationships between elements of a facility.

a. Identification of equipment

b. Limits of areas where work is performed

c. Dimensions and sizes of components in the construction

Document information

Uploaded on
March 18, 2025
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$9.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BestTutor001
3.0
(3)
Sold
29
Followers
9
Items
2614
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions