High Pressure Steam Exam Nyc Questions With Verified Solutions.
1 The maximum blow down for a safety valve on a forced flow steam generator or high temperature water boiler shall be of what percent of the set pressure? - Correct answer 10%. HP Code: 14-9.12 3 Who oversees the code for any plumbing installations? - Correct answer The NYC Plumbing Code NYC Mach: 1002.1 4 When will anchorage or guides be inspected? - Correct answer annually. NYC Mach: 1210.3.1.2 5 How many brass washout plugs does a miniature boiler have? - Correct answer not less than 3 Brass Washout Plugs 1 inches in size. HP Code 14-11.5 6 How often are high pressure piping expansion joints inspected? - Correct answer Weekly RCNY: 20-02 a.2.i (HP steam piping). NYC Mach: 1210.3.1 (hydroids - monthly) 7 How long should a Hydroid System be pressure tested for? - Correct answer 2 hours at no less than 100 PSIG. NYC Mach: 1208.1
Document information
- Uploaded on
- March 18, 2025
- Number of pages
- 18
- Written in
- 2024/2025
- Type
- Exam (elaborations)
- Contains
- Questions & answers