The 1970s law that set into place the regulation of stormwater is correct answers The clean water act Requirements for managing stormwater activity on a construction site are outlined in the following regulation correct answers NPDES Which of the following is never an allowable stormwater discharge from a construction site correct answers Discharge from contaminated ground water The notice of termination can be filed when correct answers All construction activity, inside and outside of the building, is complete and permanent stabilization has been verified as adequate to meet permit requirements Relative to stormwater permitting all of the following must occur before construction starts except correct answers Submit the notice of termination (NOT) The stormwater notice of intent (NOI) must be submitted correct answers After the SWPPP is prepared and before starting construction Potential pollutant sources stored on a construction site may include correct answers 1. Petroleum storage tanks 2. Soil sediments 3. Masonary material 4. ALL OF THE ABOVE The SWPPP inflammation sequence may be modified correct answers After consulting with the project SWPPP Designer (CEC) and, if required, the project owner and receiving written approval A SWPPP site map will show all of the following except correct answers Notices of violation Which of the following information is to be posted at the entrance of the site correct answers 1. Construction site notice 2. Permit authorization 3. Location of SWPP 4. ALL OF THE ABOVE Which of the following is NOT A beneficial use of water correct answers Flushing a spill down a storm drain When installing and maintaining a check dam make sure correct answers The low point (overflow) of the check dam is in the middle of the channel

Content preview

DVP SWPPP || with 100% Accurate Solutions.
The 1970s law that set into place the regulation of stormwater is correct answers The clean water
act

Requirements for managing stormwater activity on a construction site are outlined in the
following regulation correct answers NPDES

Which of the following is never an allowable stormwater discharge from a construction site
correct answers Discharge from contaminated ground water

The notice of termination can be filed when correct answers All construction activity, inside and
outside of the building, is complete and permanent stabilization has been verified as adequate to
meet permit requirements

Relative to stormwater permitting all of the following must occur before construction starts
except correct answers Submit the notice of termination (NOT)

The stormwater notice of intent (NOI) must be submitted correct answers After the SWPPP is
prepared and before starting construction

Potential pollutant sources stored on a construction site may include correct answers 1.
Petroleum storage tanks
2. Soil sediments
3. Masonary material
4. ALL OF THE ABOVE

The SWPPP inflammation sequence may be modified correct answers After consulting with the
project SWPPP Designer (CEC) and, if required, the project owner and receiving written
approval

A SWPPP site map will show all of the following except correct answers Notices of violation

Which of the following information is to be posted at the entrance of the site correct answers 1.
Construction site notice
2. Permit authorization
3. Location of SWPP
4. ALL OF THE ABOVE

Which of the following is NOT A beneficial use of water correct answers Flushing a spill down a
storm drain

When installing and maintaining a check dam make sure correct answers The low point
(overflow) of the check dam is in the middle of the channel

, To reduce the possibility of undercutting in channels, you should correct answers Install filter
fabric under rock and similar materials placed within the stormwater conveyance

The good housekeeping section of the SWPP must include all BUT which of the following
correct answers Post construction stormwater management procedures

Runoff controls include all but which of the following correct answers Rolled erosion control
products

Which erosion control best management practice increases water filtration, dissipates rainfall
energy and slows over flow of stormwater correct answers Vegetation

Of the following factors that influence erosion rates, the one a contractor has the most control
over (only select one) is correct answers Groundcover

Temporary stabilization should be implemented correct answers Immediately on all disturbed
areas that are likely to or will remain inactive for 14-days or more

The primary purpose of a construction exit is correct answers To remove sediment from
construction site vehicles and minimize trackout

Common types of erosion include all of the following except correct answers Sedimentation

Proper spill management should include all of the following EXCEPT correct answers
Installation of a spill pit on your construction site

The best location for portable toilets on your construction site is correct answers On ground
level, in low construction traffic areas

The following must be marked on site maps in the job site trailer as work progresses correct
answers The dates when BMP changes or additions take place

While inspecting field BMP's the SWPPP inspector should perform all of the following EXCEPT
correct answers Assume BMP's are in good condition from a distance

If your site is inspected by US EPA, or another regulatory agency, you should: correct answers 1.
Be courteous
2. Attend their inspection
3. Allow access to sight and documentation
4. ALL OF THE ABOVE

What must be done before I can give a worker a badge and access to the site correct answers
Look at the WV form and attached list, verify the workers name is on the list and look at the
workers current I.D.

Document information

Uploaded on
March 15, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SirAnton
3.7
(118)
Sold
792
Followers
438
Items
40101
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions