• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

Ust Inspector Final Paper 2025/2026 Questions With Answers Guarantee A+

Document preview thumbnail
Preview 2 out of 7 pages

When an automatic tank gauging system is used to monitor a tank, a 0.2 gallon/hour leak test must be performed: a) at least on daily b) at least once monthly c) at least once yearly d) as specified by the equipment manufacturer - b) at least once monthly; CCR 2643(b) Any person who intentionally disables or tampers with a leak detection system in a manner to prevent the system from detecting a leak is subject to a minimum fine of: a) $500 b)$1,000 c) $5,000 d)$10,000 - c) $5,000; HSC Chapter 6.7 25299(f)(2) A violation that is causing, or threatens to cause a liquid release of petroleum from an underground storage tank system is a _________ type of violation: a) Minor b) Major c) Significant d) Class II - c) Significant; CCR 2717(a)

Content preview

UST INSPECTOR FINAL PAPER 2025/2026 QUESTIONS
WITH ANSWERS GUARANTEE A+
✔✔When an automatic tank gauging system is used to monitor a tank, a 0.2 gallon/hour
leak test must be performed:
a) at least on daily
b) at least once monthly
c) at least once yearly
d) as specified by the equipment manufacturer - ✔✔b) at least once monthly; CCR
2643(b)

✔✔Any person who intentionally disables or tampers with a leak detection system in a
manner to prevent the system from detecting a leak is subject to a minimum fine of:
a) $500
b)$1,000
c) $5,000
d)$10,000 - ✔✔c) $5,000; HSC Chapter 6.7 25299(f)(2)

✔✔A violation that is causing, or threatens to cause a liquid release of petroleum from
an underground storage tank system is a _________ type of violation:
a) Minor
b) Major
c) Significant
d) Class II - ✔✔c) Significant; CCR 2717(a)

✔✔No owner or operator of a facility may deposit or allow the deposit of petroleum into
an underground storage tank system that has a red tag affixed to the system's______.
a) fill pipe
b) dispenser
c) monitoring panel
d) overfill - ✔✔a) fill pipe; CCR 2717.1(2)

✔✔An automatic shutoff device must stop the flow into the tank when the:
a) tank is 90% full
b) delivery ruck is 95% empty
c) tank is filled to no more than 95% of capacity
d) fuel level is 48 inches from the bottom of the tank - ✔✔c) tank is filled to no more
than 95% of capacity; CCR 2635(b)(2)

✔✔An automatic line leak detector is required for all pressurized piping. The automatic
line leak detector must be tested:
a) monthly
b) annually
c) every 3 years

, d) every 5 years - ✔✔b) annually; CCR 2636(f)(4) and CCR 2643(c)(3)

✔✔According to Title 23, CCR, UST Regulations, results of the tank tightness testing
must be retained for what period of time?
a) For a period of 3 years
b) For the life of the facility
c) Until the next tightness test is conducted
d) Until you are sure a release has not occurred - ✔✔a) For a period of 3 years; CCR
2712(b)

✔✔When used for release detection, automatic tank gauging systems must be certified:
a) at start up only
b) every 6 months
c) every year
d) every 3 years - ✔✔c) every year; CCR 2638(a)

✔✔The underground tank shall be inspected by the owner or operator at least once
every ______ to verify that the temporary closure measures are still place.
a) year
b) three months
c) 14 days
d) 30 days - ✔✔b) three months; CCR 2671(c)

✔✔Records for UST construction, repairs, lining, and upgrades must be kept for:
a) 10 years
b) 25 years
c) the life of the tank
d) the life of the warranty - ✔✔c) the life of the tank; CCR 2712(b)

✔✔A tank may be repaired using the interior lining method:
a) twice
b) once
c) never
d) as many times as needed - ✔✔b) once; CCR 2661(c)

✔✔Before affixing a red tag to an underground storage tank system, the local agency
shall document the:
a) date and time
b) name of the attendant
c) dispenser meter readings
d) level of product stored in tank - ✔✔d) level of product stored in tank; CCR 2717.1(c)

✔✔The secondary containment system shall be equipped with a collection system to
accumulate, temporarily store, and ______ within the system.

Document information

Uploaded on
March 14, 2025
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EXAMCAFE
3.5
(43)
Sold
294
Followers
11
Items
36820
Last sold
5 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions