CEN 800 LECTURE 8.1 EXAM 2025 QUESTIONS AND ANSWERS 100% CORRECT.

Document preview thumbnail
Preview 2 out of 11 pages

VW Court Case: Reason - ANSWER-disel emissons cheat - rigged emissions test - did not turn steering wheel during emissions test so engine did not rev to normal performance level - software cheat built into the car's computer VW case blamed - ANSWERonly engineers VW engineer sentence - ANSWER5 years in prison $250,000 in fines VW settlement cost them __________ in ___________ and __________ - ANSWER$16 billion, fines, penalites VW is from - ANSWERWolfsburg, germany potential consequence for breaking PEO code of ethics if did not break law - ANSWERlose licence PEO PEAK is - ANSWERPEO mandatory annual ethics test Bombardier vs Metrolink Lawsuit - ANSWER- Metrolinx's claim that the company's failure to deliver vehicles on time means it has defaulted on the deal will now be de

Content preview

CEN 800 LECTURE 8.1 EXAM 2025
QUESTIONS AND ANSWERS 100%
CORRECT.
VW Court Case: Reason - ANSWER-disel emissons cheat
- rigged emissions test
- did not turn steering wheel during emissions test so engine did not rev to normal
performance level
- software cheat built into the car's computer

VW case blamed - ANSWERonly engineers

VW engineer sentence - ANSWER5 years in prison
$250,000 in fines

VW settlement cost them __________ in ___________ and __________ -
ANSWER$16 billion, fines, penalites

VW is from - ANSWERWolfsburg, germany

potential consequence for breaking PEO code of ethics if did not break law -
ANSWERlose licence

PEO PEAK is - ANSWERPEO mandatory annual ethics test

Bombardier vs Metrolink Lawsuit - ANSWER- Metrolinx's claim that the company's
failure to deliver vehicles on time means it has defaulted on the deal will now be
decided by a dispute-resolution board process laid out in the contract.
- company claimed that the engineer so issued the notice of default was co-ordinating
with metrolinx and not acting impartially

Need for eng licensure grew from - ANSWERa concern for public safety during the later
half of the industrial revolution

events that led to a concern for public safety from eng projects - ANSWERA Grand
Trunk train
Quebec Bridge Disaster

Grand Trunk train year - ANSWER1864

Quebec Bridge Disaster year - ANSWER1907

, Quebec Bridge Disaster deaths - ANSWER79

Grand Trunk train deaths - ANSWERover 100

Grand Trunk train: what happened - ANSWERtrain with 458 passengers, was unable to
stop for an open swing bridge over the Richelieu River.
The train plunged into the gap and the coaches piled on top of one another.
Over 100 deaths.
Swing bridge was open
No pneumatic breaks, only friction breaks with access to them on the roof

Elliot Lake Disaster year - ANSWER2012

Elliot Lake Disaster deaths - ANSWER2

Elliot Lake Disaster details - ANSWERAlgo Mall in Elliot Lake Ontario - roof parking lot
collapses into the mall - 2 deaths
Corrosion of steel occured since the mall was build until there was too little material to
support the roof
Failure in welded connection between two steel beams and a column

Reasons for Elliot Lake Disaster collapse were determined from - ANSWER• Mall CCTV
Cameras ‐ footage during collapse
• NORR Engineering Report Summary

Elliot Lake Disaster critical design errors - ANSWER- John Kadlec of Beta Engineering
specified hollow concrete slabs - 38% higher than maximum load
- - Parking lot located on roof without adequate waterproofing

John Kadlec consequences - ANSWERInvolved in Elliot Lake Disaster
Lost PEng licence in 1990s but was reinstated in 1999

Elliot Lake Disaster criminal charges - ANSWER- Robert Wood: 2 counts of criminal
negligence causing death, 1 count causing harm

Elliot Lake Disaster role and consequences of Robert Wood - ANSWER- last person to
inspect the Algo mall
- lost PEng in 2011 months before inspecting the mall
- after losing license, was using term "Graduate Engineer" on business card
- PEO has started procedings (2016) against him for using this title

Elliot Lake Disaster - Outcome for us - ANSWER• The PEO has implemented a number
of recommendations of the Justice Belanger inquiry:
- Required minimum hours of yearly training/education of all P.Eng's (PEAK) program.
- PEO develop new standard for structural inspection

Document information

Uploaded on
March 13, 2025
Number of pages
11
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
papersmaster01
3.9
(73)
Sold
302
Followers
106
Items
14700
Last sold
1 month ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions