1. Your installation is refurbishing an existing PES facility built in 1968. Do
you need to complete an ESSP? - correct answer - Yes, and it requires
DDESB approval.
2. As distance from the potential explosion site decreases, the potential for
damage to an exposed site from an explosion.... - correct answer -
increases.
3. Your installation is increasing the NEW for a storage site built in 1969
and storing a hazard division that was not previously approved for that
location. Do you need to complete an ESSP? - correct answer - Yes,
and it requires DDESB approval.
4. Intraline distance (ILD) is the minimum distance permitted between... -
correct answer - two operating buildings.
US ARMY EXPLOSIVE SAFETY
FAMILIARIZATION EXAM 2025| BRAND NEW
ACTUAL EXAM WITH 100% VERIFIED
QUESTIONS AND CORRECT SOLUTIONS|
GUARANTEED VALUE PACK| ACE YOUR
GRADES.
1. Your installation is refurbishing an existing PES facility built in 1968. Do
you need to complete an ESSP? - correct answer - Yes, and it requires
DDESB approval.
2. As distance from the potential explosion site decreases, the potential for
damage to an exposed site from an explosion.... - correct answer -
increases.
3. Your installation is increasing the NEW for a storage site built in 1969
and storing a hazard division that was not previously approved for that
location. Do you need to complete an ESSP? - correct answer - Yes,
and it requires DDESB approval.
4. Intraline distance (ILD) is the minimum distance permitted between... -
correct answer - two operating buildings.