AIC EXAM Study Test 3 Questions and
Answers.
What would be the most appropriate means for the contractor to communicate to the project owner
b b b b b b b b b b b b b b b
an unforeseen condition not identified in the soils report?
b b b b b b b b b
A. Document the issue in the job diary
b b b b b b b
B. Issue a jobsite memorandum
b b b b
C. Draft a construction report
b b b b
D. Write a formal business letter - ANS >> D. Write a formal business letter
b b b b b b b b b b b b b b
When is the best time to distribute the working agenda to the participants of a meeting?
b b b b b b b b b b b b b b b
A. As a follow-up to the meeting
b b b b b b
B. At the beginning of the meeting
b b b b b b
C. About one day after the meeting
b b b b b b b
D. About one day prior to the meeting - ANS >> D. About one day prior to the meeting
b b b b b b b b b b b b b b b b b b
The contractor has tasked his project engineer with developing an agenda for a preconstruction
b b b b b b b b b b b b b
meeting with the architect and owner. The project engineer has received numerous emails and RFIs
b b b b b b b b b b b b b b b
from subcontractors and vendors requesting a wide range of information. Which document is most
b b b b b b b b b b b b b b
appropriate to distinguish between appropriate topics for the meeting and topics better addressed
b b b b b b b b b b b b b
through other means?
b b b
A. General conditions
b b
B. General requirements
b b
C. Technical specifications
b b b
D. Supplementary conditions - ANS >> B. General requirements
b b b b b b b b
What is the best time to distribute the meeting minutes to the participants?
b b b b b b b b b b b b
A. At the beginning of the meeting
b b b b b b
B. About one day after the meeting
b b b b b b b
C. About one hour prior to the meeting
b b b b b b b b
,D. About one day prior to the meeting - ANS >> B. About one day after the meeting
b b b b b b b b b b b b b b b b b
Which of the following statements is true about the use of texting as a means of communicating in the
b b b b b b b b b b b b b b b b b b
construction industry?
b b
A) means of easily and effectively
b b b b b
documenting communication b
B) Appropriate for clarifying but not for
b b b b b b
formal direction b
C) Should be completely avoided in
b b b b b
construction
D) Acceptable for communication if
b b b b
specifically allowed in the contract - ANS >> B) Appropriate for clarifying but not for formal direction
b b b b b b b b b b b b b b b b
A subcontractor identifies a significant discrepancy between the architectural and structural drawings.
b b b b b b b b b b b
The subcontractor immediately meets with the general contractor at their construction trailer to
b b b b b b b b b b b b b
discuss the discrepancy. The general contractor agrees that this could be a significant change
b b b b b b b b b b b b b b
depending on which of the drawings describes the designer's intent. Which of the following actions is
b b b b b b b b b b b b b b b b
the most appropriate in this situation?
b b b b b b
A) Draft a change order proposal and arrange a meeting with the design team and owner to resolve
b b b b b b b b b b b b b b b b b
the conflict.
b b
B) Draft an RFI that describes the discrepancy in detail and submit it to the architect immediately.
b b b b b b b b b b b b b b b b
C) Send a short text alerting the design team of the issue and discuss the discrepancy in detail at the
b b b b b b b b b b b b b b b b b b b
next meeting.
b b
D) Email the engineer of record to collect relevant background information and follow up with a
b b b b b b b b b b b b b b b
formal RFI to the architect - ANS >> B) Draft an RFI that describes the discrepancy in detail and submit
b b b b b b b b b b b b b b b b b b b b
it to the architect immediately.
b b b b b
What are the leadership skills needed to conduct a productive meeting?
b b b b b b b b b b
A) Planning, probing questions, responding critically, and decision making
b b b b b b b b
B) Planning, timing, coordinating, probing,
b b b b
responding critically, and following up b b b b
C) Listening attentively, responding
b b b
,constructively, soliciting all ideas, and matching decision making to the situation
b b b b b b b b b b
D) Coordinating, listening selectively, responding critically, soliciting supportive ideas, and adjusting
b b b b b b b b b b
decision making to the situation - ANS >> C) Listening attentively, responding
b b b b b b b b b b b b
constructively, soliciting all ideas, and matching decision making to the situation
b b b b b b b b b b
Which of the following statements made by the indicated parties below would least likely be made at
b b b b b b b b b b b b b b b b
an owner/architect/contractor progress meeting?
b b b b
A) Contractor: "There are 14 unanswered RFIs on the log."
b b b b b b b b b
B) Superintendent: "A third party inspector will assist the supervision of the roofing installation."
b b b b b b b b b b b b b
C) Owner: "It is very likely, that change order proposal #23 will be accepted."
b b b b b b b b b b b b b
D) Project manager: "The bond rate for ABC subcontractor is 1.45%" - ANS >> D) Project manager:
b b b b b b b b b b b b b b b b
"The bond rate for ABC subcontractor is 1.45%"
b b b b b b b b
What is a listener's retention percentage of an oral conversation?
b b b b b b b b b
A. 10%
b
B. 50%
b
C. 60%
b b
D. 90% - ANS >> A. 10%
b b b b b b
Which of the following communication methods is the most effective way to know that the
b b b b b b b b b b b b b b
communication has been understood?
b b b b
A) The sender should ask closed-ended questions and tell the receiver twice.
b b b b b b b b b b b b
B) The sender should ask open-ended questions and make them speak.
b b b b b b b b b b
C) The sender should ask how they feel and their attitude toward the activity.
b b b b b b b b b b b b b b
D) The sender should tell them what to do and get them back to work quickly. - ANS >> B) The sender
b b b b b b b b b b b b b b b b b b b b b
should ask open-ended questions and make them speak.
b b b b b b b b
Which of the following is the best example of an open-ended question?
b b b b b b b b b b b
A) Do you understand what work is
b b b b b b
supposed to be completed? b b b
B) Do you know which shovel to get me
b b b b b b b b
, from the tool shed?
b b b
C) What steps are you going to take to
b b b b b b b b
complete the activity? b b
D) How do you feel about completing the
b b b b b b b
activities assigned? - ANS >> C) What steps are you going to take to complete the activity?
b b b b b b b b b b b b b b b b
Which of the following statements about the following organizations and their justifications of its use
b b b b b b b b b b b b b b
is most appropriate when designers develop project specifications?
b b b b b b b b
A) Organize building materials by International Building Code chapters to facilitate inspections by the
b b b b b b b b b b b b b
authority having jurisdiction.
b b b
B) Only use materials tested by Underwriters Laboratories to ensure the highest quality and lowest
b b b b b b b b b b b b b b
flame spread rating.
b b b
C) Use the Construction Specification Institute's organizational system for categorizing construction
b b b b b b b b b b
materials into divisions and sections as it is widely used by the industry.
b b b b b b b b b b b b b
D) Use products endorsed by the American Society for Testing Materials to prevent the likelihood of
b b b b b b b b b b b b b b b
structural failure. - ANS >> C) Use the Construction Specification Institute's organizational system for
b b b b b b b b b b b b b b
categorizing construction materials into divisions and sections as it is widely used by the industry.
b b b b b b b b b b b b b b b
Assume you have a simple beam 16 ft long supported on each end by R1 and R2. There is a
b b b b b b b b b b b b b b b b b b b
concentrated load of 900 lb that is 4 ft from R2. Reaction R1 is pinned 12 ft from the load. Reaction
b b b b b b b b b b b b b b b b b b b b b
R1 is 225 lb and R2 is 675 lb. What is the maximum bending moment in pounds per foot?
b b b b b b b b b b b b b b b b b b b
A. 900
b b
B. 1,800
b b
C. 2,700
b b
D. 3,600 - ANS >> C. 2,700 (225 x 12)
b b b b b b b b b
Assume that you are pouring a wall that is 151 ft 4 in. long, 14 ft high and, 1 ft 4 in. thick. The crew's
b b b b b b b b b b b b b b b b b b b b b b b b
daily placement rate is 375 cy per 8-hr day. How many hours will it take to complete the wall?
b b b b b b b b b b b b b b b b b b b
A. 0.3
b b
B. 2.2
b b
C. 27.0
b b
D. 58.8 - ANS >> B. 2.2 • (151.33 ft × 14 ft × 1.33 ft) × (1 cy/27 cft) = 104.6 cy
b b b b b b b b b b b b b b b b b b b b b b
Answers.
What would be the most appropriate means for the contractor to communicate to the project owner
b b b b b b b b b b b b b b b
an unforeseen condition not identified in the soils report?
b b b b b b b b b
A. Document the issue in the job diary
b b b b b b b
B. Issue a jobsite memorandum
b b b b
C. Draft a construction report
b b b b
D. Write a formal business letter - ANS >> D. Write a formal business letter
b b b b b b b b b b b b b b
When is the best time to distribute the working agenda to the participants of a meeting?
b b b b b b b b b b b b b b b
A. As a follow-up to the meeting
b b b b b b
B. At the beginning of the meeting
b b b b b b
C. About one day after the meeting
b b b b b b b
D. About one day prior to the meeting - ANS >> D. About one day prior to the meeting
b b b b b b b b b b b b b b b b b b
The contractor has tasked his project engineer with developing an agenda for a preconstruction
b b b b b b b b b b b b b
meeting with the architect and owner. The project engineer has received numerous emails and RFIs
b b b b b b b b b b b b b b b
from subcontractors and vendors requesting a wide range of information. Which document is most
b b b b b b b b b b b b b b
appropriate to distinguish between appropriate topics for the meeting and topics better addressed
b b b b b b b b b b b b b
through other means?
b b b
A. General conditions
b b
B. General requirements
b b
C. Technical specifications
b b b
D. Supplementary conditions - ANS >> B. General requirements
b b b b b b b b
What is the best time to distribute the meeting minutes to the participants?
b b b b b b b b b b b b
A. At the beginning of the meeting
b b b b b b
B. About one day after the meeting
b b b b b b b
C. About one hour prior to the meeting
b b b b b b b b
,D. About one day prior to the meeting - ANS >> B. About one day after the meeting
b b b b b b b b b b b b b b b b b
Which of the following statements is true about the use of texting as a means of communicating in the
b b b b b b b b b b b b b b b b b b
construction industry?
b b
A) means of easily and effectively
b b b b b
documenting communication b
B) Appropriate for clarifying but not for
b b b b b b
formal direction b
C) Should be completely avoided in
b b b b b
construction
D) Acceptable for communication if
b b b b
specifically allowed in the contract - ANS >> B) Appropriate for clarifying but not for formal direction
b b b b b b b b b b b b b b b b
A subcontractor identifies a significant discrepancy between the architectural and structural drawings.
b b b b b b b b b b b
The subcontractor immediately meets with the general contractor at their construction trailer to
b b b b b b b b b b b b b
discuss the discrepancy. The general contractor agrees that this could be a significant change
b b b b b b b b b b b b b b
depending on which of the drawings describes the designer's intent. Which of the following actions is
b b b b b b b b b b b b b b b b
the most appropriate in this situation?
b b b b b b
A) Draft a change order proposal and arrange a meeting with the design team and owner to resolve
b b b b b b b b b b b b b b b b b
the conflict.
b b
B) Draft an RFI that describes the discrepancy in detail and submit it to the architect immediately.
b b b b b b b b b b b b b b b b
C) Send a short text alerting the design team of the issue and discuss the discrepancy in detail at the
b b b b b b b b b b b b b b b b b b b
next meeting.
b b
D) Email the engineer of record to collect relevant background information and follow up with a
b b b b b b b b b b b b b b b
formal RFI to the architect - ANS >> B) Draft an RFI that describes the discrepancy in detail and submit
b b b b b b b b b b b b b b b b b b b b
it to the architect immediately.
b b b b b
What are the leadership skills needed to conduct a productive meeting?
b b b b b b b b b b
A) Planning, probing questions, responding critically, and decision making
b b b b b b b b
B) Planning, timing, coordinating, probing,
b b b b
responding critically, and following up b b b b
C) Listening attentively, responding
b b b
,constructively, soliciting all ideas, and matching decision making to the situation
b b b b b b b b b b
D) Coordinating, listening selectively, responding critically, soliciting supportive ideas, and adjusting
b b b b b b b b b b
decision making to the situation - ANS >> C) Listening attentively, responding
b b b b b b b b b b b b
constructively, soliciting all ideas, and matching decision making to the situation
b b b b b b b b b b
Which of the following statements made by the indicated parties below would least likely be made at
b b b b b b b b b b b b b b b b
an owner/architect/contractor progress meeting?
b b b b
A) Contractor: "There are 14 unanswered RFIs on the log."
b b b b b b b b b
B) Superintendent: "A third party inspector will assist the supervision of the roofing installation."
b b b b b b b b b b b b b
C) Owner: "It is very likely, that change order proposal #23 will be accepted."
b b b b b b b b b b b b b
D) Project manager: "The bond rate for ABC subcontractor is 1.45%" - ANS >> D) Project manager:
b b b b b b b b b b b b b b b b
"The bond rate for ABC subcontractor is 1.45%"
b b b b b b b b
What is a listener's retention percentage of an oral conversation?
b b b b b b b b b
A. 10%
b
B. 50%
b
C. 60%
b b
D. 90% - ANS >> A. 10%
b b b b b b
Which of the following communication methods is the most effective way to know that the
b b b b b b b b b b b b b b
communication has been understood?
b b b b
A) The sender should ask closed-ended questions and tell the receiver twice.
b b b b b b b b b b b b
B) The sender should ask open-ended questions and make them speak.
b b b b b b b b b b
C) The sender should ask how they feel and their attitude toward the activity.
b b b b b b b b b b b b b b
D) The sender should tell them what to do and get them back to work quickly. - ANS >> B) The sender
b b b b b b b b b b b b b b b b b b b b b
should ask open-ended questions and make them speak.
b b b b b b b b
Which of the following is the best example of an open-ended question?
b b b b b b b b b b b
A) Do you understand what work is
b b b b b b
supposed to be completed? b b b
B) Do you know which shovel to get me
b b b b b b b b
, from the tool shed?
b b b
C) What steps are you going to take to
b b b b b b b b
complete the activity? b b
D) How do you feel about completing the
b b b b b b b
activities assigned? - ANS >> C) What steps are you going to take to complete the activity?
b b b b b b b b b b b b b b b b
Which of the following statements about the following organizations and their justifications of its use
b b b b b b b b b b b b b b
is most appropriate when designers develop project specifications?
b b b b b b b b
A) Organize building materials by International Building Code chapters to facilitate inspections by the
b b b b b b b b b b b b b
authority having jurisdiction.
b b b
B) Only use materials tested by Underwriters Laboratories to ensure the highest quality and lowest
b b b b b b b b b b b b b b
flame spread rating.
b b b
C) Use the Construction Specification Institute's organizational system for categorizing construction
b b b b b b b b b b
materials into divisions and sections as it is widely used by the industry.
b b b b b b b b b b b b b
D) Use products endorsed by the American Society for Testing Materials to prevent the likelihood of
b b b b b b b b b b b b b b b
structural failure. - ANS >> C) Use the Construction Specification Institute's organizational system for
b b b b b b b b b b b b b b
categorizing construction materials into divisions and sections as it is widely used by the industry.
b b b b b b b b b b b b b b b
Assume you have a simple beam 16 ft long supported on each end by R1 and R2. There is a
b b b b b b b b b b b b b b b b b b b
concentrated load of 900 lb that is 4 ft from R2. Reaction R1 is pinned 12 ft from the load. Reaction
b b b b b b b b b b b b b b b b b b b b b
R1 is 225 lb and R2 is 675 lb. What is the maximum bending moment in pounds per foot?
b b b b b b b b b b b b b b b b b b b
A. 900
b b
B. 1,800
b b
C. 2,700
b b
D. 3,600 - ANS >> C. 2,700 (225 x 12)
b b b b b b b b b
Assume that you are pouring a wall that is 151 ft 4 in. long, 14 ft high and, 1 ft 4 in. thick. The crew's
b b b b b b b b b b b b b b b b b b b b b b b b
daily placement rate is 375 cy per 8-hr day. How many hours will it take to complete the wall?
b b b b b b b b b b b b b b b b b b b
A. 0.3
b b
B. 2.2
b b
C. 27.0
b b
D. 58.8 - ANS >> B. 2.2 • (151.33 ft × 14 ft × 1.33 ft) × (1 cy/27 cft) = 104.6 cy
b b b b b b b b b b b b b b b b b b b b b b