• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 14 pages
Exam (elaborations)

CEPSCI PRACTICE TEST / 111 Questions with Certified Solutions.| 2025 LATEST UPDATED

Document preview thumbnail
Preview 2 out of 14 pages

CEPSCI PRACTICE TEST / 111 Questions with Certified Solutions.| 2025 LATEST UPDATED

Content preview

CEPSCI PRACTICE TEST / 111 Questions with Certified Solutions.| 2025

LATEST UPDATED

1972 clean water act - (answers)Administered by the US environmental protection agency (EPA)
Created the NPDES


1987 - (answers)Amendment to CWA CALLED WATER QUALITY ACT


NPDES in south carolina - (answers)South Carolina is NPDES delegated state.


NPDES regulations are administered by - (answers)SCDHEC


CGP authorizes - (answers)stormwater discharges from construction sites


Who must obtain NPDES coverage - (answers)land disturbing activities greater than or equal to
1 acre
-land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone


NPDES permits are issued to - (answers)operator-person or company for a particular discharge


primary permittee - (answers)-has day to day operational control to ensure compliance with
SWPP
-typically the owner or developer


primary permittee responsibilites - (answers)submit NOI, Preparation of the C_SWPPP


Secondary permittee - (answers)individual lot owner or residential builder that conducts land
disturbing activity limited to an individual lot or group of lots as part of approved LCP of
development

, contractors - (answers)must on Contractor Certification- D-0437


On-Site SWPPP - (answers)SCDHEC CGP, NOI, NPDES coverage approval letter, Contractor
Certifications, Local Approvals, USACE approvals, Critical area permit(coast)


OS_SWPPP - (answers)a copy of signed and certified SWPPP, NOI, and CGP coverage letter
from DHEC must be retained at site or electronically accessible


minor modification to ON-SWPPP - (answers)minor modifications made directly in the field,do
not need approval by DHEC- additional BMP's, removal of disturbed areas


major modifications to OS-SWPPP - (answers)must be made by qualified individual and
submitted to DHEC or appropriate delegated entity for approval


Phased plan requirement > 5 - (answers)include a phased stormwater management plan which
identifies all BMP's and grading work conducted during a specific portion of the sites
construction sequence. Each phase identified on at least one separate plan sheet.


Phased plan requirement < 10 but > 5 acres - (answers)at least two separate plan phases are
required - initial land disturbance phase - stabilization phase


Phased plan requirement ≥ 10 acres - (answers)at least 3 separate plan phases are required -
initial land disturbance phase - construction phase - stabilization phase


All compliance inspection must include invesg. of, at a minimum of 5 of the following -
(answers)1. areas of site disturbed by construction activity and areas used for storage of materials
exposed to precipitation
2. stormwater conveyance systems for evidence of sediment
3. BMP's identified in OS-SWPPP
4. Discharge location to investigate if sediment leaving site, or if such locations are inaccessible,
nearby downstream location if possible.
5. Where vehicles enter or exit site for evidence of off-site sediment tracking.

Document information

Uploaded on
March 9, 2025
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$24.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudyGiant
4.3
(71)
Sold
7480
Followers
7
Items
3376
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions