• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

ACI Aggregate Testing Technician Exam Study Guide 100% Verified.

Document preview thumbnail
Preview 2 out of 12 pages

©THESTAR 2024/2025 ALL RIGHTS RESERVED 12:54PM. 1 ACI Aggregate Testing Technician Exam Study Guide 100% Verified. Performance Checklist: Sampling of Aggregates: Flowing Aggregate Stream (Bins or Belt Discharge) 5 steps - Answer1. Use a device that will hold the required amount of material without overflowing. 2. Take each increment from the entire cross section of the material discharge stream 3. Obtain a minimum of three approximately equal increments. 4. Combine the increments to form a field sample. 5. Ensure that the size of the field sample equals or exceeds the approximate minimum mass needed or stated in Table 1. Performance Checklist: Sampling of Aggregates: Conveyor Belt ©THESTAR 2024/2025 ALL RIGHTS RESERVED 12:54PM. 2 7 Steps - Answer1. Stop the conveyor belt and insert two templates conforming to the shape of the belt into the aggregate steam. 2. Space the templates so the material between will yield an increment of the required mass. 3. Carefully scoop the material between the templates into a suitable container. 4. Collect the fines with a brush and dust pan and add to the container. 5. Obtain a minimum of three approximately equal increments. 6. Combine the increments to form a field sample. 7. Ensure that the size of the field sample equals or exceeds the approximate minimum mass needed or stated in Table 1. Performance Checklist: Sampling of Aggregates: Stockpiles (Manual Sampling) 7 Steps - AnswerCourse Aggregate 1. Shove a board vertically into the pile just above the sampling point. 2. Take increments from the top third, mid-point, and bottom third of the volume of the pile. Fine Aggregate 3. Remove the outer layer and sample from the material beneath. ©THESTAR 2024/2025 ALL RIGHTS RESERVED 12:54PM. 3 4. Insert the appropriate sampling tube randomly to extract the increments. 5. Obtain a minimum of five increments. Coarse and Fine Aggregate 6. Combine the increments to form a field sample. 7. Ensure that the size of the field sample equals or exceeds the approximate minimum mass needed or stated in Table 1. Performance Checklist: Sampling of Aggregates: Transportation Units (Manual Sampling) 7 Steps - Answer1. Excavate a min

Content preview

©THESTAR 2024/2025 ALL RIGHTS RESERVED 12:54PM.




ACI Aggregate Testing Technician Exam
Study Guide 100% Verified.


Performance Checklist:


Sampling of Aggregates:


Flowing Aggregate Stream (Bins or Belt Discharge)


5 steps - Answer✔1. Use a device that will hold the required amount of material without
overflowing.


2. Take each increment from the entire cross section of the material discharge stream


3. Obtain a minimum of three approximately equal increments.


4. Combine the increments to form a field sample.


5. Ensure that the size of the field sample equals or exceeds the approximate minimum mass
needed or stated in Table 1.
Performance Checklist:


Sampling of Aggregates:


Conveyor Belt

1

, ©THESTAR 2024/2025 ALL RIGHTS RESERVED 12:54PM.




7 Steps - Answer✔1. Stop the conveyor belt and insert two templates conforming to the shape
of the belt into the aggregate steam.


2. Space the templates so the material between will yield an increment of the required mass.


3. Carefully scoop the material between the templates into a suitable container.


4. Collect the fines with a brush and dust pan and add to the container.


5. Obtain a minimum of three approximately equal increments.


6. Combine the increments to form a field sample.


7. Ensure that the size of the field sample equals or exceeds the approximate minimum mass
needed or stated in Table 1.
Performance Checklist:


Sampling of Aggregates:


Stockpiles (Manual Sampling)


7 Steps - Answer✔Course Aggregate
1. Shove a board vertically into the pile just above the sampling point.


2. Take increments from the top third, mid-point, and bottom third of the volume of the pile.


Fine Aggregate
3. Remove the outer layer and sample from the material beneath.

2

Document information

Uploaded on
March 5, 2025
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheStar
3.7
(140)
Sold
734
Followers
178
Items
28642
Last sold
6 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions