July 1 2024, service techs shall possess or work under someone who has a current certification indicating
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
he or she has passed the ? - Correct Answers California UST service technician exam
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! ICC cert must be renewed every? - Correct Answers 24 months
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! Service techs must posses or be employed by a person who has the appropriate contractors license
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! unless? - Correct Answers The individual has a Tank testing licens
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! Service tech is defined by any individual who? - Correct Answers Test UST monitoring equipment
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
Trouble shoots UST systems II! II! II! II!
Installs UST monitoring equipment II! II! II!
II! If the manufacturer training no longer exist , the local angency may? - Correct Answers Approve
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! comparable alternat training . II! II! II!
II! UST includes? - Correct Answers Tank and connected piping
II! II! II! II! II! II! II! II! II! II! II! II! II!
II! What is considered and UST - Correct Answers petroleum storage tank
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! What UST system meets the requirements for secondary containment? - Correct Answers Doubled wall
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! tanks
II! According to title 23; the following piping components if installed after July 1 1987 must have secondary
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! containment - Correct Answers Pressured product piping II! II! II! II! II! II! II! II! II! II! II!
, II! Considered "pipe" on tanks installed after July 1 2003 - Correct Answers Pressured product piping and
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! below ground vapor recovery II! II! II!
II! Under dispenser containment (UDC) was required for all UST systems by - Correct Answers December
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! 31 2003 II!
II! System for exchanging gas vapors in a storage tank and product in a fuel delivery truck - Correct Answers
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
Stage 1 vapor recovery
II! II! II! II! II! II!
II! An approved method for non visual monitoring for existing UST systems. - Correct Answers Statistical
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! Inventory Reconciliation (SIR) II! II!
II! ATG must be capable for detecting a release of ? - Correct Answers .2 gallons per hour
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! Manual inventory reconciliation. - Correct Answers No longer an approved method for non visual
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! monitoring on existing UST systems II! II! II! II!
II! Automatic line leak detectors installed on underground piping with secondary containment shall be
II! II! II! II! II! II! II! II! II! II! II! II!
II! capable of tetecting a leak of ? - Correct Answers 3 gallons per hour at 10 psi
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! ATG should be programmed to test the tank ? - Correct Answers At least monthly
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! According to PEI RP 300 a combustible gas can be used to ? - Correct Answers Detect vapor leaks in a
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! vapor recovery system.II! II!
II! According to PEI RP 300. A written scope of work for vapor recovery installation should include? - Correct
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! Answers Construction plans II! II! II! II! II! II!
II! Positive shut off overfill protection device must stop the flow of fuel when the tank is no more then ? -
II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II! II!
II! Correct Answers 95% full II! II! II! II! II! II! II!