ICC Service Technician Study Guide
Questions & Answers
According to CCR, Title 23 UST Regulations, What is the frequency
that the Monitor Certification must be performed? -
correct answer ✅Every 12 Months
If visual monitoring is utilized as the means of release detection for
single walled tank, it must be conducted on a _______ Basis. -
correct answer ✅Daily
The Purpose of spill and overfill protection equipment is to
minimize the potential for a release during: -
correct answer ✅Fuel Deliveries
Which of the following is a potential symptom of toxic petroleum
exposure: -
correct answer ✅Dizziness
Tremors
Eye irritation
All of the above(correct)
Under-Dispenser Containment is required for ______ underground
storage tank systems -
correct answer ✅All
,ICC Service Technician Study Guide
Questions & Answers
All of the following are true for Automatic Tank Gauging (ATG)
except for: -
correct answer ✅ATG system are required to be installed in all UST
system
According to CCR Title 23, UST regulations Spill containment (spill
bucket) must meet all of the following requirements except: -
correct answer ✅Be installed on vent risers
Suction piping may not require leak detection if it has one check
valve located where? -
correct answer ✅Directly below the suction pump
Service Technician performing work on Monitoring equipment must
be trained and certified by __________ -
correct answer ✅The manufacture of the equipment.
Air monitoring must be conducted ________ when performing
work within a confined space. -
correct answer ✅Prior to and during
,ICC Service Technician Study Guide
Questions & Answers
A UST Service Technician must be recertified by the equipment
Manufacture at the time interval recommended by the equipment
manufacture or at least every ____ months, whichever is greater. -
correct answer ✅36 Months
When an automatic tank gauge is utilized for single-walled tank leak
detection, it shall test the tank at least monthly after product
delivery or when the tank is filled to within _____ percent of the
highest operating level during the previous month. -
correct answer ✅10
The following is true of spill buckets except: -
correct answer ✅Must provide drainage for spilled product into
the secondary containment sump.
If during an inspection of dispensing equipment at a retail gas
station you find that the product is dispensing at a significant lower
rate than usual. You should check: -
correct answer ✅For piping leaks.
According to CCR title 23, UST Regulations the local agency must be
notified by the Owner/Operator how long before conducting
, ICC Service Technician Study Guide
Questions & Answers
Secondary Containment Testing? -
correct answer ✅At least 48 hours before the test.
Poppet Valves are a Vapor Recovery Component installed: -
correct answer ✅on the vapor recovery riser
If equipped with an ATG it shall be programmed to test the tank
_______? -
correct answer ✅at least monthly
A Vacuum-assist nozzle is a component of a(n) ________? -
correct answer ✅Stage II vapor recovery system
Stage I Vapor Recovery can be installed in the following
configured(s): -
correct answer ✅Dual Point, Manifold, & Coaxial
An Underground tank System includes: -
correct answer ✅The underground storage tank
Piping
Ancillary Equipment
Questions & Answers
According to CCR, Title 23 UST Regulations, What is the frequency
that the Monitor Certification must be performed? -
correct answer ✅Every 12 Months
If visual monitoring is utilized as the means of release detection for
single walled tank, it must be conducted on a _______ Basis. -
correct answer ✅Daily
The Purpose of spill and overfill protection equipment is to
minimize the potential for a release during: -
correct answer ✅Fuel Deliveries
Which of the following is a potential symptom of toxic petroleum
exposure: -
correct answer ✅Dizziness
Tremors
Eye irritation
All of the above(correct)
Under-Dispenser Containment is required for ______ underground
storage tank systems -
correct answer ✅All
,ICC Service Technician Study Guide
Questions & Answers
All of the following are true for Automatic Tank Gauging (ATG)
except for: -
correct answer ✅ATG system are required to be installed in all UST
system
According to CCR Title 23, UST regulations Spill containment (spill
bucket) must meet all of the following requirements except: -
correct answer ✅Be installed on vent risers
Suction piping may not require leak detection if it has one check
valve located where? -
correct answer ✅Directly below the suction pump
Service Technician performing work on Monitoring equipment must
be trained and certified by __________ -
correct answer ✅The manufacture of the equipment.
Air monitoring must be conducted ________ when performing
work within a confined space. -
correct answer ✅Prior to and during
,ICC Service Technician Study Guide
Questions & Answers
A UST Service Technician must be recertified by the equipment
Manufacture at the time interval recommended by the equipment
manufacture or at least every ____ months, whichever is greater. -
correct answer ✅36 Months
When an automatic tank gauge is utilized for single-walled tank leak
detection, it shall test the tank at least monthly after product
delivery or when the tank is filled to within _____ percent of the
highest operating level during the previous month. -
correct answer ✅10
The following is true of spill buckets except: -
correct answer ✅Must provide drainage for spilled product into
the secondary containment sump.
If during an inspection of dispensing equipment at a retail gas
station you find that the product is dispensing at a significant lower
rate than usual. You should check: -
correct answer ✅For piping leaks.
According to CCR title 23, UST Regulations the local agency must be
notified by the Owner/Operator how long before conducting
, ICC Service Technician Study Guide
Questions & Answers
Secondary Containment Testing? -
correct answer ✅At least 48 hours before the test.
Poppet Valves are a Vapor Recovery Component installed: -
correct answer ✅on the vapor recovery riser
If equipped with an ATG it shall be programmed to test the tank
_______? -
correct answer ✅at least monthly
A Vacuum-assist nozzle is a component of a(n) ________? -
correct answer ✅Stage II vapor recovery system
Stage I Vapor Recovery can be installed in the following
configured(s): -
correct answer ✅Dual Point, Manifold, & Coaxial
An Underground tank System includes: -
correct answer ✅The underground storage tank
Piping
Ancillary Equipment