• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

ACI Exam 2024

Document preview thumbnail
Preview 2 out of 12 pages

Exam of 12 pages for the course ACI WRITTEN at ACI WRITTEN (ACI Exam 2024)

Content preview

ACI Exam 2024

1. The temperature measuring device shall be capable of
accurately measuring
the temperature of freshly mixed concrete to_____
throughout a range of
______: 30 degrees, 120 degrees
2. A composite sample of concrete is required even if the
only purpose for
obtaining the sample is to determine temperature. True or
False?: False
3. A maximum temperature of freshly mixed concrete is
specified in ASTM
C1064. True of False?: False
4. Sampling by this practice covers procedures for obtaining
representative
samples, on which tests are to be performed to determine
____ with quality
requirements of the specifications under which the concrete
is furnished.: -
Compliance
5. The elapsed time between obtaining the first and final
portions of a composite
sample shall not exceed: 15 minutes
6. Start the tests for slump, temperature, and air content
within _____ after
obtaining the final portion of the composite sample: 5
minutes
7. Start molding specimens for strength tests within____
after fabricating the
composite sample: 15 minutes
8. The concrete sample must be protected from
contamination and _____: -
Rapid evaporation
1

, 9. The composite sample from a truck mixer must be
obtained from the _____
portion of the batch: Middle
10. The slump test is applicable to plastic concrete with a
maximum size
aggregate of _____: 1 1/2 inches
11. When the concrete contains aggregate larger than that
permitted for a
particular test method, the sample of concrete must be _____
_____ before
making the test.: Removed by wet sieving the sample over 1 1/2
inch wet sieve
12. The sample of concrete for use in making the slump test
must be obtained
with Practice _____: C172/C172M
13. The surface on which the slump mold will be placed must
be ______,
_______, ______, and _____: flat, moist, nonabsorbent, and rigid
14. The approximate concrete depth (in vertical distance)
after placing the first
layer is _____, and the second layer is _____: 2 5/8 in and 6
1/8 in
15. The slump of the concrete is measured and reported to
the nearest _____.-
: quarter of an inch
16. How much time is allowed to conduct the slump test from
beginning to
completion?: 2 1/2 minutes
17. The diameter of the tampering rod used in this test
method is: 5/8 in +- 1/16
in
18. What is the required minimum frequency of the vibrator
used in this test
method?: 9000 vibrations per minute (150 hz)

2

Document information

Uploaded on
February 26, 2025
Number of pages
12
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
4
Followers
0
Items
97
Last sold
4 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions