1|Page
ACI AGGREGATE TESTING TECHNICIAN - LEVEL 1
EXAM|| ACTUAL EXAM ALL QUESTIONS AND 100%
CORRECT ANSWERS ALREADY GRADED A+||
LATEST AND COMPLETE UPDATE 2025 WITH
VERIFIED SOLUTIONS|| GUARANTEED PASS!!!
AASHTO R 90
Sampling should be done very carefully because it is as important as _____
Testing
AASHTO R 90
The four sources that a field sample can be obtained from are:
1) Conveyor belts
2 0 Transport belts
3)Roadways
4) Stockpiles
AASHTO R 90
Shipping containers for aggregate samples should be made so that the contents will
not be lost, ____, or ______
Contaminated; damaged
,2|Page
AASHTO R 76
Unless the procedures recommended here are carried out precisely, a _ sample can
result.
Nonrepresentative
AASHTO R 76
Generally speaking, small samples are most representative of the total supply.
True/ False
False
AASHTO R 76
There are some instances in which ___ between the test samples can't be avoided.
Differences
AASHTO R 76
When reduction of the field sample before testing isn't recommended, the _____
field sample should be tested.
Entire
,3|Page
AASHTO R 76
What determines whether large-sized particles are equally distributed among the
test samples that have been reduced.
Laws of chance
AASHTO R 76
Method A, the ----- method, must be used with fine, dry aggregate.
Mechanical splitter
AASHTO R 76
If method B or C is to be used, ______ the sample.
Moisten
AASHTO R 76
If Method A is to be used and the sample is wet, _____ the sample.
Dry
, 4|Page
AASHTO R 76
Method C, miniature stockpiling, cannot be used for _______ or mixtures of coarse
and fine aggregate.
Coarse Aggregates.
AASHTO R 76
Method _____ involves the use of chutes, holding receptacles, and hoppers or
straight edge pans.
A
AASHTO R 76
Sample splitters must have ____ equal width chutes for course aggregate and
_____ for fine aggregate.
8; 12
AASHTO R 76
The differences or variations in the procedures of method B are based on the ___
of the floors surface.
Evenness
ACI AGGREGATE TESTING TECHNICIAN - LEVEL 1
EXAM|| ACTUAL EXAM ALL QUESTIONS AND 100%
CORRECT ANSWERS ALREADY GRADED A+||
LATEST AND COMPLETE UPDATE 2025 WITH
VERIFIED SOLUTIONS|| GUARANTEED PASS!!!
AASHTO R 90
Sampling should be done very carefully because it is as important as _____
Testing
AASHTO R 90
The four sources that a field sample can be obtained from are:
1) Conveyor belts
2 0 Transport belts
3)Roadways
4) Stockpiles
AASHTO R 90
Shipping containers for aggregate samples should be made so that the contents will
not be lost, ____, or ______
Contaminated; damaged
,2|Page
AASHTO R 76
Unless the procedures recommended here are carried out precisely, a _ sample can
result.
Nonrepresentative
AASHTO R 76
Generally speaking, small samples are most representative of the total supply.
True/ False
False
AASHTO R 76
There are some instances in which ___ between the test samples can't be avoided.
Differences
AASHTO R 76
When reduction of the field sample before testing isn't recommended, the _____
field sample should be tested.
Entire
,3|Page
AASHTO R 76
What determines whether large-sized particles are equally distributed among the
test samples that have been reduced.
Laws of chance
AASHTO R 76
Method A, the ----- method, must be used with fine, dry aggregate.
Mechanical splitter
AASHTO R 76
If method B or C is to be used, ______ the sample.
Moisten
AASHTO R 76
If Method A is to be used and the sample is wet, _____ the sample.
Dry
, 4|Page
AASHTO R 76
Method C, miniature stockpiling, cannot be used for _______ or mixtures of coarse
and fine aggregate.
Coarse Aggregates.
AASHTO R 76
Method _____ involves the use of chutes, holding receptacles, and hoppers or
straight edge pans.
A
AASHTO R 76
Sample splitters must have ____ equal width chutes for course aggregate and
_____ for fine aggregate.
8; 12
AASHTO R 76
The differences or variations in the procedures of method B are based on the ___
of the floors surface.
Evenness