What four things influence quality? - Correct Answer-Time - Actual Life > Design Life
Serviceability - Ease of use and maintenance
Cost - Minimize
Return on investment - Optimize Life Cycle Cost
Laboratories have to be... - Correct Answer-Qualified
Technicians have to be... - Correct Answer-Qualified
STRNG stands for - Correct Answer-Sampling, testing, and reporting guide for Quality
Assurance Procedures
The contractor only gets paid based on what data? - Correct Answer-Verified QC data
What materials are NOT covered by the QC plan? - Correct Answer-Sods and Sealers
The point of Quality control inspection, sampling, and testing is to... - Correct Answer-
Control the level of quality being produced in the end product.
The QC plan must be submitted, by the contractor, how many days prior to starting work
on any QC material? - Correct Answer-7 days
How many days does the Engineer/The Department have to approve the QC plan? -
Correct Answer-10 days of submittal
What specification contains the QC plan specs? - Correct Answer-Specification 105
Specification 105-1.2.2 defines - Correct Answer-That Quality Control inspection must
provide all necessary inspection to assure effectiveness not limited to sampling and
testing, production, storage, delivery, construction, and placement.
Verification Testing is only use for what purpose? - Correct Answer-Used to verify
Quality Control results
What happens when there is non-favorable comparison between QC and VT testing? -
Correct Answer-The Resolution testing is used to determine which results will be used.
What three entities performs Quality Control? - Correct Answer-Manufacturer
Producer
Contractor
What entity performs Quality Assurance? - Correct Answer-FDOT
, POSCVRM stands for - Correct Answer-Plan
Organize
Staff
Check
Verify
Recheck
Measure for Quality
What materials are covered by the QC plan? - Correct Answer-Hot Mix Asphalt
Portland Cement Concrete (Structural)
Earthwork
Cementitious Materials
Timber
Steel and Misc Metals
Galvanized Metal Products
Prestressed and/or Precast Concrete Products
Drainage Products
Fiber Reinforced Polymer Products
If an Earthwork test goes to Resolution and isn't verified with the QC what results will be
used? - Correct Answer-VT results
If an Asphalt test goes to Resolution and isn't verified with the QC what results will be
used? - Correct Answer-Resolution Results
What and when is an Independent Verification test relative? - Correct Answer-An
independent Verification test is performed by any qualified FDOT representative at any
time. Including checking any areas in question.
When does Independent Assurance happen? - Correct Answer-Independent Assurance
happens annually based only on tests completed that year in MAC.
Ex: If no plant samples have been completed then no IA for it.
Is Quality Assurance program at the Federal or State government level? - Correct
Answer-State
The Quality Control Plan are only applied at the Federal or State government level? -
Correct Answer-State
Who prepares the Quality Control Plan? - Correct Answer-The Contractor
Under the new CQC has testing increased? - Correct Answer-True
QC is 100%
VT 25%
IV 10%