Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

FDOT Asphalt Paving Level 2 Questions and Answers Best rated A+ Guaranteed Success Latest Update

Document preview thumbnail
Preview 2 out of 7 pages

The decision-making authority on a job needs to be given to who? - ️️Needs to be given to the level closet to the work as specified in the specifications. It ensure a quick handle on situations and issues. The governing order of project documents from high (1) to low (7) starts with the highest being - ️️Special Provisions The governing order of project documents from high to low (2) - ️️Technical Special Provisions What makes up a quality asphalt mixture? - ️️A quality asphalt mixture is determined by the constructability, if it conforms to Specifications, and if it satisfies functional requirements. CQC - ️️contractor quality control Superpave - ️️Asphalt mix design system since 1998

Content preview

FDOT Asphalt Paving Level 2
The decision-making authority on a job needs to be given to who? - ✔️✔️Needs to be
given to the level closet to the work as specified in the specifications. It ensure a quick
handle on situations and issues.

The governing order of project documents from high (1) to low (7) starts with the highest
being - ✔️✔️Special Provisions

The governing order of project documents from high to low (2) - ✔️✔️Technical Special
Provisions

What makes up a quality asphalt mixture? - ✔️✔️A quality asphalt mixture is
determined by the constructability, if it conforms to Specifications, and if it satisfies
functional requirements.

CQC - ✔️✔️contractor quality control

Superpave - ✔️✔️Asphalt mix design system since 1998

QCP - ✔️✔️Quality control plan

QCM - ✔️✔️Quality control Manual

QC - ✔️✔️Quality Control (Contracting Testing and Inspection)

VT - ✔️✔️Verification Testing (FDOT or CEI Verification)

CEI - ✔️✔️Construction Engineering and Inspection

RT - ✔️✔️Resolution Testing (FDOT)

IV - ✔️✔️Independent Verification Testing

IA - ✔️✔️Independent Assurance Testing


The governing order of project documents from high to low (3) - ✔️✔️Plans

The governing order of project documents from high to low (4) - ✔️✔️Road design,
structures, and traffic operations standards

, The governing order of project documents from high to low (5) - ✔️✔️Developmental
Specifications

The governing order of project documents from high to low (6) - ✔️✔️Supplemental
Specifications

The governing order of project documents from high to low (7) - ✔️✔️Standard
Specifications

What are the key components in a pre-paving conferences? - ✔️✔️Key Personnel
(Paving superintendent)
Contractor Input
Agency Input
QC Plan Review
Discuss more specific key topics or issues
Meeting Minutes
Action items (what to do in situations, who to call)

What are the key components in a pre-construction conferences? - ✔️✔️Agency Input
(FDOT)
Contractor Input (Including the Prime)
Project Personnel (Upper - Middle management)
Testing
Safety
Utilities
Cities or Municipalities (HOA, school boards)
Suppliers

What causes the compactive effort increase? - ✔️✔️Crushed aggregate content
Nominal maximum size
Hardness of the aggrergate
Angularity of aggregate
Less natural sand
High dust content mixes
Gradation of the mix greatly affects compaction
Superpave mixes

What kind of Performance Graded binders are there? - ✔️✔️PG 67-22 (old AC-30)
PG 52-82
PG 58-22
PG 76-22 (PMA) Polymer modified asphalt
PG 76-22 (ARB) Asphalt rubber binder
PG 82-22 (PMA) polymer modified asphalt

Document information

Uploaded on
February 22, 2025
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$8.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
quizletquizizzy
5.0
(1)
Sold
9
Followers
0
Items
517
Last sold
6 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions