Nccco Core Exam Outline With Solutions #18.
Timber or steel - correct answer These materials should be used when setting up on
soft surfaces such as soft ground, asphalt or backfilled material

Over the corner - correct answer On crawler cranes, which boom position creates the
greatest ground pressure

Blocking - correct answer Allows the weight of the crane and load to be distributed over
a greater surface area. Should be used under outrigger floats at all times.

3 - correct answer Blocking should be at least how many times the surface area of the
float

Energized - correct answer Overhead power lines must be considered to be in this
condition until electrical authorities indicate otherwise

Prohibited zone - correct answer No part of the crane or load must ever enter this area
around an energized power line

Kv - correct answer The prohibited zone must be enlarged as this increases

20 foot - correct answer What minimum distance does OSHA require be maintained
when voltage up to 350 kv is unknown

50 foot - correct answer What minimum distance is required if the voltage is over 350 kv
and unknown

Qualified signal person - correct answer This person must be appointed any time the
crane is working within a boom's length of the prohibited zone

Tag lines - correct answer The use of these should be avoided when lifting near power
lines, however if necessary should be non-conductive type

Above power lines - correct answer Avoid operating cranes or handling materials in this
area of power lines

Remain in the cab - correct answer What does an operator do if the crane comes in
contact with a power line

Jump - correct answer If it is necessary to leave the crane cab before power lines are
de-energized after contact, how does the operator exit the cab

Transmission towers - correct answer A crane can also become electrically charged
when working close to these (radio, microwave, cell)

, Manufacturer - correct answer Before traveling on site with a load, be sure that this is
allowed by the

Backward collapse - correct answer Ensure the boom low enough when traveling with a
load to avoid the possibility of this

Toward the load - correct answer Always travel in this direction when traveling with a
load

Boom extension, jib, or pinned section - correct answer Most manufacturers do not
permit travel with a load when the boom is in these settings

Raised - correct answer To prevent a lattice boom crane from tipping forward, the boom
should be in this position before traveling down an incline

Lowered - correct answer To prevent a lattice boom crane from tipping backwards, the
boom should be in this position when traveling up an incline

Controlling entity - correct answer Responsible for seeing that the ground conditions are
adequate to support the equipment.

Controlling entity - correct answer Responsible for informing the user and the operator
of the equipment of the location of hazards beneath the equipment set-up area (such as
voids, tanks, utilities)

Controlling entity - correct answer Responsible for establishing a system to coordinate
the operations of two cranes that operate within each other's working radius

Key items of inspection - correct answer hoist rope & reeving, op aids & safety devices,
cab windows/equipment, hooks & latches, fluid levels (crankcase oil, coolant, hydraulic
oil, etc.), elec equipment, leveling device, control & drive mechanisms, fire extinguisher,
air/hydraulic system

Access to job site - correct answer firm & reasonably level surface, no buried pipes,
utilities, sewers, tanks, etc.

Leveling the crane - correct answer Important to accomplish when setting up a crane on
a grade

1% - correct answer Load chart capacities are based on the crane being level within this
percentage

Carpenter's level - correct answer Use this tool placed under or close to the boom foot
for an accurate measure of level

Document information

Uploaded on
February 21, 2025
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
101
Followers
44
Items
5717
Last sold
1 month ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions