Failure to maintain OSHA logs could result in a base made the final payment
penalty of ? - (ANSWER)$1000 to the general contractor
on September 13 1999
The minimum number of employees that will The latest date the
require a contractor to obtain workmen's subcontractor can serve
compensation insurance is ? - (ANSWER)1 employee a notice to preserve his
claim under the
The type of bond that guarantees that the Conatitution Lein Law is
contractor is I'll perform the work in accordance what date and when ? -
with the contract is know as a ? bond - (ANSWER)September 13
(ANSWER)Performance Bond 1999 or day before
payment
Short term project schedule is detailed explanation
of the next two weeks of construction activities and The type of contract we
should be developed and or reviewed by all the are in the contractor《主啊
following except ? - (ANSWER)Architect agrees to carry out ,我心
stipulated job in 愿归向
The ? usually prepares the project schedule - exchange for a fix some
你
(ANSWER)Project manager of the money is a?
Contract -
In order to provide adequate control the project (ANSWER)Lump sum
schedule should be formally reviewed and updated -
(ANSWER)At least once every 30 days When a contractor has to
perform extra work for a
A contract will not be enforced if it is ? - subcontractor he will
(ANSWER)Illegal recover the cost in the
form of a? -
According to the statute of frauds a contract need (ANSWER)Back charge
not be in writing and still be enforceable in Florida
if it is ? - (ANSWER)Less than $500 in value and less The ? Should be jointly
than 1 year in length prepared with the
material and equipment
The ? has the duty to record and post a Notice of schedule -
Commencement to improve real property - (ANSWER)Project
(ANSWER)Owner schedule
A subcontractor started work on his contract with Based on the completed
the General Contractor on August 1 1999 The owner contract method for a
1/5
,FLORIDA ELECTRICAL BUSINESS EXAM NEWEST 2025
job bid at $300,000 and currently 66.67% complete
with a gross profit of 16.67% ($50,000) the current Under the completed
amount of profit recognized would be ? - contract method the
(ANSWER)$0 contractor may realize
the profit ______ -
Prior to the beginning a drug test program an (ANSWER)When the
employer shall ensure that at least ? days elapse project is nearly
between the notice and the start of testing - complete
(ANSWER)60 days
A secondary qualifying
A lien that is properly perfected may be discharged Agent has pulled a
by Amy of the filling except ? - (ANSWER)The permit for a building
completion of the project project. There is a
problem with payment
After relocating his business to a new location the to a subcontractor, 《主啊
contractor has _____ days to notify the Board of his _______ is responsible,我心
new address - (ANSWER)45 days for the payment to the
愿归向
subcontractor - 你
______ days is the maximum time after commencing (ANSWER)Primary
construction for the contractor to give notice to the qualifier
owner of his lien rights - (ANSWER)45 days
In the event of a
And action for the breach of a written contract qualifying agent _______
must be brought within ______ years - (ANSWER)5 may finish an existing
years project that is under
contract with the
All of the following must follow OSHA regulations deceased qualifier -
standards except _____ establishments - (ANSWER)Any one
(ANSWER)Religious
Citation issued by a car
The type of estimate that provides precise enforcement officer shot
statements of quantities of materials, equipment, include all the following
and man power is considered to be a ______ - except _______? -
(ANSWER)Detailed estimate (ANSWER)The name of
the person who filed a
When preparing an equipment estimate ________ complaint
would not need to be evaluated - (ANSWER)Safety
factors involved The type of contract
2/5
Failure to maintain OSHA logs could result in a base made the final payment
penalty of ? - (ANSWER)$1000 to the general contractor
on September 13 1999
The minimum number of employees that will The latest date the
require a contractor to obtain workmen's subcontractor can serve
compensation insurance is ? - (ANSWER)1 employee a notice to preserve his
claim under the
The type of bond that guarantees that the Conatitution Lein Law is
contractor is I'll perform the work in accordance what date and when ? -
with the contract is know as a ? bond - (ANSWER)September 13
(ANSWER)Performance Bond 1999 or day before
payment
Short term project schedule is detailed explanation
of the next two weeks of construction activities and The type of contract we
should be developed and or reviewed by all the are in the contractor《主啊
following except ? - (ANSWER)Architect agrees to carry out ,我心
stipulated job in 愿归向
The ? usually prepares the project schedule - exchange for a fix some
你
(ANSWER)Project manager of the money is a?
Contract -
In order to provide adequate control the project (ANSWER)Lump sum
schedule should be formally reviewed and updated -
(ANSWER)At least once every 30 days When a contractor has to
perform extra work for a
A contract will not be enforced if it is ? - subcontractor he will
(ANSWER)Illegal recover the cost in the
form of a? -
According to the statute of frauds a contract need (ANSWER)Back charge
not be in writing and still be enforceable in Florida
if it is ? - (ANSWER)Less than $500 in value and less The ? Should be jointly
than 1 year in length prepared with the
material and equipment
The ? has the duty to record and post a Notice of schedule -
Commencement to improve real property - (ANSWER)Project
(ANSWER)Owner schedule
A subcontractor started work on his contract with Based on the completed
the General Contractor on August 1 1999 The owner contract method for a
1/5
,FLORIDA ELECTRICAL BUSINESS EXAM NEWEST 2025
job bid at $300,000 and currently 66.67% complete
with a gross profit of 16.67% ($50,000) the current Under the completed
amount of profit recognized would be ? - contract method the
(ANSWER)$0 contractor may realize
the profit ______ -
Prior to the beginning a drug test program an (ANSWER)When the
employer shall ensure that at least ? days elapse project is nearly
between the notice and the start of testing - complete
(ANSWER)60 days
A secondary qualifying
A lien that is properly perfected may be discharged Agent has pulled a
by Amy of the filling except ? - (ANSWER)The permit for a building
completion of the project project. There is a
problem with payment
After relocating his business to a new location the to a subcontractor, 《主啊
contractor has _____ days to notify the Board of his _______ is responsible,我心
new address - (ANSWER)45 days for the payment to the
愿归向
subcontractor - 你
______ days is the maximum time after commencing (ANSWER)Primary
construction for the contractor to give notice to the qualifier
owner of his lien rights - (ANSWER)45 days
In the event of a
And action for the breach of a written contract qualifying agent _______
must be brought within ______ years - (ANSWER)5 may finish an existing
years project that is under
contract with the
All of the following must follow OSHA regulations deceased qualifier -
standards except _____ establishments - (ANSWER)Any one
(ANSWER)Religious
Citation issued by a car
The type of estimate that provides precise enforcement officer shot
statements of quantities of materials, equipment, include all the following
and man power is considered to be a ______ - except _______? -
(ANSWER)Detailed estimate (ANSWER)The name of
the person who filed a
When preparing an equipment estimate ________ complaint
would not need to be evaluated - (ANSWER)Safety
factors involved The type of contract