• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 2 pages
Exam (elaborations)

Walmart - Stormwater Exam Questions And Answers |Latest 2025 | Guaranteed Pass

Document preview thumbnail
Preview 1 out of 2 pages

©THESTAR 2024/2025 ALL RIGHTS RESERVED 1:27PM. A+ 1 | P a g e Walmart - Stormwater Exam Questions And Answers |Latest 2025 | Guaranteed Pass. The 1970's law that set into place the regulation of stormwater is: - AnswerThe Clean Water Act Requirements for managing stormwater activity on a construction site are outlined in the following regulation: - AnswerNPDES Which of the following is never an allowable stormwater discharge from a construction site? - AnswerDischarge from contaminated groundwater The Notice of termination can filed when: - AnswerAll construction activity, inside and outside the building, is complete and permanent stabilization verified Relative to stormwater permitting, all of the following must occur before construction starts except: - AnswerSubmit the notice of termination (NOT) Which erosion control best mgmt practice increases water infiltration, dissipates rainfall energy and slows overland flow of stormwater - AnswerVegetation Of the following factors that influence erosion rates, the one a contractor has the most control over is: - AnswerGroundcover Temporary stabilization should be implemented - AnswerImmediately on all disturbed areas that are likely to or will remain inactive

Content preview

©THESTAR 2024/2025 ALL RIGHTS RESERVED 1:27PM. A+




Walmart - Stormwater Exam Questions And
Answers |Latest 2025 | Guaranteed Pass.


The 1970's law that set into place the regulation of stormwater is: - Answer✔The Clean Water
Act
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation: - Answer✔NPDES
Which of the following is never an allowable stormwater discharge from a construction site? -
Answer✔Discharge from contaminated groundwater

The Notice of termination can filed when: - Answer✔All construction activity, inside and outside
the building, is complete and permanent stabilization verified
Relative to stormwater permitting, all of the following must occur before construction starts
except: - Answer✔Submit the notice of termination (NOT)
Which erosion control best mgmt practice increases water infiltration, dissipates rainfall energy
and slows overland flow of stormwater - Answer✔Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most control
over is: - Answer✔Groundcover

Temporary stabilization should be implemented - Answer✔Immediately on all disturbed areas
that are likely to or will remain inactive for 14-days or more

The Primary purpose of a construction exit is - Answer✔To remove sediment from construction
site vehicles and minimize trackout

Common types of erosion include all of the following except - Answer✔Sedimentation

Which of the following is NOT a beneficial use of water? - Answer✔Flushing a spill down a
storm drain

When installing and maintaining a check dam make sure: - Answer✔The low point (overflow) of
the check dam is in the middle of the channel



1|Page

Document information

Uploaded on
February 21, 2025
Number of pages
2
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
TheStar
3.7
(140)
Sold
721
Followers
178
Items
27902
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions