Walmart - Stormwater Exam Questions And
Answers |Latest 2025 | Guaranteed Pass.
The 1970's law that set into place the regulation of stormwater is: - Answer✔The Clean Water
Act
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation: - Answer✔NPDES
Which of the following is never an allowable stormwater discharge from a construction site? -
Answer✔Discharge from contaminated groundwater
The Notice of termination can filed when: - Answer✔All construction activity, inside and outside
the building, is complete and permanent stabilization verified
Relative to stormwater permitting, all of the following must occur before construction starts
except: - Answer✔Submit the notice of termination (NOT)
Which erosion control best mgmt practice increases water infiltration, dissipates rainfall energy
and slows overland flow of stormwater - Answer✔Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most control
over is: - Answer✔Groundcover
Temporary stabilization should be implemented - Answer✔Immediately on all disturbed areas
that are likely to or will remain inactive for 14-days or more
The Primary purpose of a construction exit is - Answer✔To remove sediment from construction
site vehicles and minimize trackout
Common types of erosion include all of the following except - Answer✔Sedimentation
Which of the following is NOT a beneficial use of water? - Answer✔Flushing a spill down a
storm drain
When installing and maintaining a check dam make sure: - Answer✔The low point (overflow) of
the check dam is in the middle of the channel