Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 20 pages
Exam (elaborations)

IL SEPTIC INSTALLERS EXAM QUESTIONS AND ANSWERS

Document preview thumbnail
Preview 3 out of 20 pages

IL SEPTIC INSTALLERS EXAM QUESTIONS AND ANSWERS

Content preview

IL SEPTIC INSTALLERS EXAM
QUESTIONS AND ANSWERS



Public Sewer Connection - Answer-Private residence must connect if w/in 300' or for any commercial
bldg. w/in 300' that has flows less than 1500 gpd. Commercial w/ flows = to or greater than 1500 gpd
must connect if sewer is w/in 1000'.

Unless physical barrier, ordinance, or cannot be done w/ individual line (4" line)-then PSD system is OK.



Acceptable Pipe Materials - Answer-Vitrified clay, ductile iron, or plastic.

Anything after the tank or from distribution box has to be vitrified clay or plastic.



Schedule 40 or Greater - Answer-under roads, driveways, or parking areas



Gravity Slope - Answer-Diameter: 4" pipe + min. slope of 12" per 100'



Building sewers in excess of 50' should have what? - Answer-A C/O @ least every 50' from building to
tank, distribution box, or ATU



Creviced Limestone Formation - Answer-SS system cannot be installed where bottom of system is less
than 4' from top of limestone

,If limestone is known to be present a soil test must be done @ least 4' deeper than where the bottom of
the trench will be



How far away can quick disconnect be? - Answer-no more than 50' away from the device & w/in sight of



Experimental Use Permits - Answer-min. of 10 experimental systems installed b4 unconditional approval
granted. Permit valid for 2 yrs & evaluated @ end of 2 yrs.



2 options for garbage grinders - Answer-1. solids retention tank btwn WW source & septic tk. for kitchen
waste only. Needs to be 50% of the size of the designed septic tank w/ a min. of 500 gals.

2. A septic tank receiving all flows sized as 50% of the septic tank size + septic tank size. i.e., septic tk =
1500 gals. /2 = 750 + 1500 = 2250 (would need 2500 gal tk)



How long should a homeowner keep maint. records for their system? - Answer-the life of the system



When should the 1st maintenance of a septic tank after installation be completed for a residence? -
Answer-Prior to or within 3 yrs. After initial inspection it can be done once every 5 yrs. Can be done by
everyone + homeowner



If sludge layer /suspended solids are greater than 33% . . . - Answer-Must pump tank and perform
maintenance



When should a septic system be evaluated initially after installation for a non-residential bldg? - Answer-
prior to or w/in 3 yrs. After that it should be done @ least every 3 yrs.

Owner cannot do. has to be engineer, env. health practitioner, member of dept, HD, or septic contractor



Aerobic Treatment Unit Evaluations - Answer-1 every 6 mos @ least (same ppl) + HOMEOWNER as long
as they follow manufacturer's requirements & proper maintenance

, What is the maint. schedule for SFs & WSPs w/ surface discharges? - Answer-@ least 1 per yr. + H.O. if
rules r followed. Pumped when solids & scum greater than 33%



Can a H.O. install & maintain a septic system on his/her property? - Answer-Yes



Who can perform the excavation for a septic system? - Answer-A licensed installer (employee while
supervised) or the property owner.



What is the min. size tank for flows UP TO 500 gpd? - Answer-750 gals.



If flows are greater than 500 gpd, how do you size the tank? - Answer-Tank size should be = to @ least
1.5x the estimated sewage flow



How do you size a tank(s) for flows greater than 1350 gpd? - Answer-U must use multiple tks. in a series
or multiple compartment tks. where the 1st tank or the 1st comp. in a multicomp. tk. is 1/2-2/3 of the
total required capacity. of the tank(s)



How do you size the tank for a raised filter bed for a residence? - Answer-It has to be an NSF 40 batch
treatment system. The aeration tank has to be 2x the daily flow



How do you size the tank for a RFB for a commercial bldg? - Answer-The aeration tk. has to be 3x the
daily flow.



Multiple tanks in a series connected @ btm for flow equalization can be used



How are RFB sidewalls sized? - Answer-3:1 ratio



How are distribution lines for RFBs? - Answer-4" perforated pipe on 15" centers

Document information

Uploaded on
February 21, 2025
Number of pages
20
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$17.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Zanaya
4.5
(12)
Sold
77
Followers
29
Items
10176
Last sold
2 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions