Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

Construction Quality Management for Contractors Exam Questions And Answers Latest Update

Document preview thumbnail
Preview 2 out of 5 pages

Construction Quality Management for Contractors Exam Questions And Answers Latest Update

Content preview

Construction Quality Management for Contractors Exam Questions And Answers Latest Update


Construction Quality Management for Contractors
Exam Questions And Answers Latest Update
The _________ consists of daily checks of the work to assure continuing compliance
with contract requirements - ✔✔✔-Follow-up Phase



Design-Build contracts require - ✔✔✔-The QC Manager to be in place and take an
active role in the review and coordination of the design.



Which of the following is included in all three phases of the Three Phases of
Control? - ✔✔✔-Safety



The purpose of Construction Quality Management is to - ✔✔✔-Achieve the quality
established by properly developed requirements through the combined
responsibility, but separate, efforts of contractors and government personnel



Testing is extremely important in construction quality management and is
performed by - ✔✔✔-Both the contractor and the government



The primary purpose of the Three-Phase Control System is to - ✔✔✔-Require the
contractor to plan, schedule, and perform quality management actions to assure
work meets all specified quality standards



Quality Assurance Personnel have the responsibility to - ✔✔✔-Require the
contractor to maintain the quality specified in the plans and specifications



The _________________ is the appropriate time to assure that all materials and/or
equipment have been tested, submitted, and approved - ✔✔✔-Preparatory Phase



The Preconstruction Conference and Coordination and Mutual Understanding
Meeting Are - ✔✔✔-Conducted prior to the commencement of any physical
construction work

©®™ Page 1

, Construction Quality Management for Contractors Exam Questions And Answers Latest Update




Contractor testing procedures: - ✔✔✔-Are specified in the technical specs, outlined
in the QCP, and addressed at Coordination and Mutual Understanding Meeting



The Quality Control Plan contains - ✔✔✔-Identification of individual quality quality
control personnel, including name, qualifications, assigned duties, responsibilities
and authorities.



Tests that are unannounced, randomly performed, and repeat quality control tests
are - ✔✔✔-Quality assurance tests



The contractor is required to conduct a Preparatory Phase Meeting before they
begin any definable feature of work except when - ✔✔✔-There are no exceptions to
the rule



During the punch-out inspection of a project: - ✔✔✔-Quality Control personnel
prepare and punch-list and make corrections



The Quality Control Report should include - ✔✔✔-All of the above



In a design build contract, if the contractor has a question about the design, what
is the process to get an answer? - ✔✔✔-Contractor submits a design verification
request to the contractor's design team



Submittals are - ✔✔✔-Necessary to demonstrate that the proposed materials, etc.
are in compliance with the contract.



The success or failure of all contractors is based upon - ✔✔✔-The ability to control
costs, finance work, estimate jobs, schedule the work and maintain effective
quality control




©®™ Page 2

Document information

Uploaded on
February 18, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudyAtlas
3.8
(436)
Sold
1860
Followers
1470
Items
7260
Last sold
2 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions