Name: Score:
15 Multiple choice questions
Definition 1 of 15
What Factors effect the design of a TTC plan
work that moves intermittently or continuously
May use truck-mounted impact attenuators
What was observed (devices and position, weather, traffic flow, flagging opperations,
incidents)
needed corrections and if corrected, when?
Traffic Factors, characteristics, and speed.
Traffic controls, urban features, and traffic generators
Long-term stationary
Intermediate-term stationary
short-term stationary
short-duration
mobile
Definition 2 of 15
What stage:
Select best traffic control alternative
based on: safety, mobility, cost, constructability
Design
Analysis
Method
Development
,Definition 3 of 15
Working with the media
News announcements
Phone hotline
door hangers / notices
PCMS
one of the TMP (Transportation Management Plan) requirements
Public relations
Customer service
Personal selling
Strong ties
Definition 4 of 15
What stage:
Gather available data
Prior to occupying TTC zone
Consider the needs of all users
Coordinate between adjacent or overlapping projects
Planning
Controlling
Organizing
Leading
Definition 5 of 15
Refers to TTC projects being broken into multiple steps
Could be dangerous due to devices and workers on the move
coordination and timing are key
Sequencing
Overload
Reving
Phasing
, Definition 6 of 15
What are the MUTCD categories of Work Duration?
work that moves intermittently or continuously
May use truck-mounted impact attenuators
More than 1 day, less than 3 days
Nightime work of more than 1 hour
Traffic Factors, characteristics, and speed.
Traffic controls, urban features, and traffic generators
Long-term stationary
Intermediate-term stationary
short-term stationary
short-duration
mobile
Definition 7 of 15
Long-term stationary (MUTCD work duration category)
Daytime work 1 to 12 hours
cones and portable signs
Occupies location more than 3 days
larger channelizing devices and post mounted signs
conflicting roadway markings removed and replaced with temporary markings
cover or remove conflicting signage
Long-term stationary
Intermediate-term stationary
short-term stationary
short-duration
mobile
More than 1 day, less than 3 days
Nightime work of more than 1 hour
15 Multiple choice questions
Definition 1 of 15
What Factors effect the design of a TTC plan
work that moves intermittently or continuously
May use truck-mounted impact attenuators
What was observed (devices and position, weather, traffic flow, flagging opperations,
incidents)
needed corrections and if corrected, when?
Traffic Factors, characteristics, and speed.
Traffic controls, urban features, and traffic generators
Long-term stationary
Intermediate-term stationary
short-term stationary
short-duration
mobile
Definition 2 of 15
What stage:
Select best traffic control alternative
based on: safety, mobility, cost, constructability
Design
Analysis
Method
Development
,Definition 3 of 15
Working with the media
News announcements
Phone hotline
door hangers / notices
PCMS
one of the TMP (Transportation Management Plan) requirements
Public relations
Customer service
Personal selling
Strong ties
Definition 4 of 15
What stage:
Gather available data
Prior to occupying TTC zone
Consider the needs of all users
Coordinate between adjacent or overlapping projects
Planning
Controlling
Organizing
Leading
Definition 5 of 15
Refers to TTC projects being broken into multiple steps
Could be dangerous due to devices and workers on the move
coordination and timing are key
Sequencing
Overload
Reving
Phasing
, Definition 6 of 15
What are the MUTCD categories of Work Duration?
work that moves intermittently or continuously
May use truck-mounted impact attenuators
More than 1 day, less than 3 days
Nightime work of more than 1 hour
Traffic Factors, characteristics, and speed.
Traffic controls, urban features, and traffic generators
Long-term stationary
Intermediate-term stationary
short-term stationary
short-duration
mobile
Definition 7 of 15
Long-term stationary (MUTCD work duration category)
Daytime work 1 to 12 hours
cones and portable signs
Occupies location more than 3 days
larger channelizing devices and post mounted signs
conflicting roadway markings removed and replaced with temporary markings
cover or remove conflicting signage
Long-term stationary
Intermediate-term stationary
short-term stationary
short-duration
mobile
More than 1 day, less than 3 days
Nightime work of more than 1 hour