Exam (elaborations)

Florida Electrical Business Exam Newest 2025 Actual Exam Complete 100 Questions And Correct Detailed Answers (Verified Answers) |Already Graded A+

Document preview thumbnail
Preview 2 out of 6 pages

FLORIDA ELECTRICAL BUSINESS EXAM NEWEST 2025 ACTUAL EXAM COMPLETE 100 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

Content preview

FLORIDA ELECTRICAL BUSINESS EXAM NEWEST 2025 ACTUAL

EXAM COMPLETE 100 QUESTIONS AND CORRECT DETAILED

ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED A+

Failure to maintain OSHA logs could result in a base penalty of ? - (answers)$1000


The minimum number of employees that will require a contractor to obtain workmen's
compensation insurance is ? - (answers)1 employee


The type of bond that guarantees that the contractor is I'll perform the work in accordance with
the contract is know as a ? bond - (answers)Performance Bond


Short term project schedule is detailed explanation of the next two weeks of construction
activities and should be developed and or reviewed by all the following except ? -
(answers)Architect


The ? usually prepares the project schedule - (answers)Project manager


In order to provide adequate control the project schedule should be formally reviewed and
updated - (answers)At least once every 30 days

你是想要一篇“眼睛容易
A contract will not be enforced if it 阅读的”中文文章
is ? - (answers)Illegal


According to the statute of frauds a contract need not be in writing and still be enforceable in
Florida if it is ? - (answers)Less than $500 in value and less than 1 year in length


The ? has the duty to record and post a Notice of Commencement to improve real property -
(answers)Owner

, A subcontractor started work on his contract with the General Contractor on August 1 1999 The
owner made the final payment to the general contractor on September 13 1999 The latest date the
subcontractor can serve a notice to preserve his claim under the Conatitution Lein Law is what
date and when ? - (answers)September 13 1999 or day before payment


The type of contract we are in the contractor agrees to carry out stipulated job in exchange for a
fix some of the money is a? Contract - (answers)Lump sum


When a contractor has to perform extra work for a subcontractor he will recover the cost in the
form of a? - (answers)Back charge


The ? Should be jointly prepared with the material and equipment schedule - (answers)Project
schedule


Based on the completed contract method for a job bid at $300,000 and currently 66.67%
complete with a gross profit of 16.67% ($50,000) the current amount of profit recognized would
be ? - (answers)$0


Prior to the beginning a drug test program an employer shall ensure that at least ? days elapse
between the notice and the start of testing - (answers)60 days


A lien that is properly perfected may be discharged by Amy of the filling except ? - (answers)The
completion of the project
你是想要一篇“眼睛容易
阅读的”中文文章
After relocating his business to a new location the contractor has _____ days to notify the Board
of his new address - (answers)45 days


______ days is the maximum time after commencing construction for the contractor to give
notice to the owner of his lien rights - (answers)45 days


And action for the breach of a written contract must be brought within ______ years - (answers)5
years

Document information

Uploaded on
February 15, 2025
Number of pages
6
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$20.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudyGiant
4.3
(71)
Sold
7480
Followers
7
Items
3373
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions