• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

U1 UST Installation/Retrofitting Exam Questions And Answers| Already Graded A+| Latest Update

Document preview thumbnail
Preview 3 out of 19 pages

©FYNDALY 2024/2025 ALL RIGHTS RESERVED 2:11PM. A+ 1 U1 UST Installation/Retrofitting Exam Questions And Answers| Already Graded A+| Latest Update. 1. One of the significant causes of leaks in underground liquid storage systems is ____________ ________________ - AnswerImproper Installation 2. Written Plans are required to - Answerobtain permits, solicit bids, and provide precise guidance for installers. 3. The plans should - AnswerDescribe the property, identify the size and location of the tanks, indicate the liquids to be stored and provide the location of the dispensers and piping. 4. Storage systems discussed in this recommended practice are usually regulated by - AnswerFederal, state or local agencies. 5. All owners should ensure that the equipment to be installed meets - Answerapplicable regulatory requirements before being installed 6. Consult the local authorities who have jurisdiction in the area before storage-system plans are - Answerfinalized or construction is initiated. 7. All owners should ensure that the equipment to be installed meets all applicable regulatory requirements before - AnswerBeing installed. 8. To avoid damage tanks must not be - Answerdropped, dragged, or handled with sharp objects. 9. Tanks must not be dropped, dragged, or handled with sharp objects to avoid - AnswerDamage to the tank 10. The only time tanks really should be moved is when - Answerfor inspections and testing. 11. If a tanks is damaged at all throughout the moving process it must be - AnswerRepaired in accordance with the manufacture's instructions. ©FYNDALY 2024/2025 ALL RIGHTS RESERVED 2:11PM. A+ 2 12. The proper way to move a tank is by lifting it, using the - AnswerLift lugs that are installed by the manufacturer. 13. Tanks should be carefully lifted and lowered using - AnswerCables or chains of adequate length. 14. When two lifting lugs are being used, the angle between the lifting cable and vertical should be no more than - Answer30 degrees. 15. Stockpile piping materials and equipment in a _____________ _________ on the job site - AnswerSecure area 16. Confirm adherence to specifications by reporting to the owner about any - Answerdetected damage that could result in leakage or premature corrosion. 17. Pressure test single-walled tanks with _____ to _______ psig air pressure, soaping all surfaces, seams and fittings while inspecting for bubbles. - Answer3 to 5 18. Air testing with over ___ psig (3 Psig for 12-Ft. Diameter FRP tanks) is hazardous and may damage the tank - Answer5 psig 19. Do not air test a tank that has previously contained - Answerflammable or combustible liquids 20. Place ______ barricades at the ends of tanks being tested. - AnswerWarning 21. Avoid tank ends, man-ways, and fittings while the tank is under - AnswerPressure 22. Release pressure in the tank before disconnecting any - Answergauges or test fittings. 23. Be aware some manufactures do not tighten fittings to allow for _____________ _____________ during shipping and storage. - AnswerTemperature changes 24. True or False: Air tests are inconclusive without soaping and careful inspection for bubbles? - AnswerTrue 25. Tanks gauges must have a scale that will permit detection of small changes in __________ that might go undetected on gauges with a ___________ _________. - AnswerPressure, broader range. 26. Since the best accuracy of gauges is at mid-range, and test pressures must not exeed 5 psig, use a gauge with a maximum limit of ____ or ______ - Answer10 or 15 psig 27. Check the gauges __________ and _________ before use - Answeroperation and accuracy 28. Underground storage systems may include vap

Content preview

©FYNDALY 2024/2025 ALL RIGHTS RESERVED 2:11PM. A+




U1 UST Installation/Retrofitting Exam
Questions And Answers| Already Graded A+|
Latest Update.


1. One of the significant causes of leaks in underground liquid storage systems is ____________
________________ - Answer✔Improper Installation

2. Written Plans are required to - Answer✔obtain permits, solicit bids, and provide precise
guidance for installers.

3. The plans should - Answer✔Describe the property, identify the size and location of the tanks,
indicate the liquids to be stored and provide the location of the dispensers and piping.
4. Storage systems discussed in this recommended practice are usually regulated by -
Answer✔Federal, state or local agencies.

5. All owners should ensure that the equipment to be installed meets - Answer✔applicable
regulatory requirements before being installed
6. Consult the local authorities who have jurisdiction in the area before storage-system plans
are - Answer✔finalized or construction is initiated.
7. All owners should ensure that the equipment to be installed meets all applicable regulatory
requirements before - Answer✔Being installed.

8. To avoid damage tanks must not be - Answer✔dropped, dragged, or handled with sharp
objects.
9. Tanks must not be dropped, dragged, or handled with sharp objects to avoid -
Answer✔Damage to the tank

10. The only time tanks really should be moved is when - Answer✔for inspections and testing.

11. If a tanks is damaged at all throughout the moving process it must be - Answer✔Repaired in
accordance with the manufacture's instructions.



1

, ©FYNDALY 2024/2025 ALL RIGHTS RESERVED 2:11PM. A+


12. The proper way to move a tank is by lifting it, using the - Answer✔Lift lugs that are installed
by the manufacturer.

13. Tanks should be carefully lifted and lowered using - Answer✔Cables or chains of adequate
length.
14. When two lifting lugs are being used, the angle between the lifting cable and vertical should
be no more than - Answer✔30 degrees.
15. Stockpile piping materials and equipment in a _____________ _________ on the job site -
Answer✔Secure area
16. Confirm adherence to specifications by reporting to the owner about any -
Answer✔detected damage that could result in leakage or premature corrosion.
17. Pressure test single-walled tanks with _____ to _______ psig air pressure, soaping all
surfaces, seams and fittings while inspecting for bubbles. - Answer✔3 to 5
18. Air testing with over ___ psig (3 Psig for 12-Ft. Diameter FRP tanks) is hazardous and may
damage the tank - Answer✔5 psig

19. Do not air test a tank that has previously contained - Answer✔flammable or combustible
liquids

20. Place ______ barricades at the ends of tanks being tested. - Answer✔Warning

21. Avoid tank ends, man-ways, and fittings while the tank is under - Answer✔Pressure

22. Release pressure in the tank before disconnecting any - Answer✔gauges or test fittings.
23. Be aware some manufactures do not tighten fittings to allow for _____________
_____________ during shipping and storage. - Answer✔Temperature changes
24. True or False: Air tests are inconclusive without soaping and careful inspection for bubbles?
- Answer✔True
25. Tanks gauges must have a scale that will permit detection of small changes in __________
that might go undetected on gauges with a ___________ _________. - Answer✔Pressure,
broader range.
26. Since the best accuracy of gauges is at mid-range, and test pressures must not exeed 5 psig,
use a gauge with a maximum limit of ____ or ______ - Answer✔10 or 15 psig

27. Check the gauges __________ and _________ before use - Answer✔operation and accuracy

28. Underground storage systems may include vapor-recovery - Answer✔Piping and equipment


2

, ©FYNDALY 2024/2025 ALL RIGHTS RESERVED 2:11PM. A+


29. What can cause premature storage-system failures _________ - Answer✔Debris and other
foreign materials
30. Tank installers should have gone through training programs to improve their skills and
insure the install is __________ - Answer✔Successful
31. __________ kinds of plans are required to obtain permits, solicit bids, and provide precise
guidance for installers - Answer✔written
32. ___________________ should insure that the equipment to be installed meets all
applicable regulatory requirements before beginning an installation - Answer✔Owners

33. Tanks should be ___________ inspected before installation - Answer✔Visually

34. 2 Gauges should be used to reduce ___________ ____________ - Answer✔gauge failure
35. A pressure-relief device should e used to prevent _______________ ____________ -
Answer✔Over pressurization

36. True of False: Over pressurization could be a result of temperature changes - Answer✔True
37. To avoid damaging the interstitial space between tank walls from over-pressurization, avoid
pressurizing the inner tank to a maximum of______ psig - Answer✔5 psig

38. Double wall tanks pressure should be monitored for _____ hour - Answer✔1
39. If a compartment has single walled bulkheads, test the compartments on ___________
___________ of the same bulkhead at different times. - Answer✔A. Opposite sides
B. Different sides
C. Adjacent sides
D. Congruent sides
Answer B
40. If the compartmented tank has double-walled bulkheads, compartments may be tested at
the _____________ __________ - Answer✔A. First time
B. Second time
C. Same time
D. Last time
Answer C



3

Document information

Uploaded on
February 13, 2025
Number of pages
19
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Fyndlay
3.6
(79)
Sold
441
Followers
82
Items
22077
Last sold
4 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions