Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

(DBIA) Design-Build Test #1: Questions With Expert Solutions (A+)

Document preview thumbnail
Preview 2 out of 5 pages

(DBIA) Design-Build Test #1: Questions With Expert Solutions (A+)

Content preview

(DBIA) Design-Build Test #1: Questions With Expert
Solutions (A+)

T/F: The solicitation and basis for award for Design-Bid-Build is both
quantitative and qualitative. Right Ans - False

T/F: Design-Bid-Build is typically Low Bid Based. Right Ans - True

T/F: One of the factors for success of a Design-Build delivery system is to
engage the construction team before 20% of the design is completed by the
owner. Right Ans - True

T/F: Proposals with 35% or more of the design in the RFP will more than
likely be based on Low Bid (Price). Right Ans - True

T/F: As long as Design-Builder meets performance requirements, the Design-
Builder has some flexibility to figure out the best approach. Right Ans -
True

What existing Federal Law required any federal project exceeding $100,000 to
require two bonds (Performance Bond and Labor and Material Bond)?
Right Ans - Miller Act

What are the 3 fundamental decisions an Owner must make when initiating a
feasible project? Right Ans - Type of delivery system, type of procurement
method, and type of contract format.

Design-Build means ________________. Right Ans - One company/firm is
responsible for both design and construction, construction can begin before
all the designs are complete.

What is a primary reason for choosing a Design-Build delivery system?
Right Ans - If the project needs to be done fast, it places more risk on owner, if
the owner wishes to fast track project design and construction, if the project is
complex and requires close coordination of design and construction.

Owners who choose to use Design-Build as their project delivery method of
choice should expect all of the following outcomes except for:

, a) cost guarantee during design
b) time savings
c) increased administration
d) high quality
e) cost savings Right Ans - c) increased administration

All of the following are forms of a Design-Build entity except:
a) Joint Venture
b) Integrated DB Firm
c) Owner Led
d) A/E Led
e) GC Led Right Ans - c) owner led

Design-Build project delivery will not likely be effective the following
condition(s) exist:
a) The owner cannot adequately specify performance and programming
requirements
b) The owner insists on absolute design control
c) The project program limits innovation and flexibility
d) All of the above Right Ans - d) all of the above

Which of the following best describes the Low Bid type of procurement
option?
a) Strictly a price driven selection
b) The procurement process is time consuming and resource intensive
c) There are no incentives for innovation or exceptional performance
d) Review process is fast and simple
e) All of the above best describe the Low Bid type of procurement option
Right Ans - e) all of the above

The _________ contract approach/payment methodology does not guarantee a
price and provides little incentive for the Designer-Builder to be efficient.
Right Ans - Cost-Plus-Fee

Under this contract approach/payment methodology, the contractor or
design-builder collaborates with Owner to establish pricing with no profit at
the beginning of the job and fees are earned quarterly if performance and
pricing are met. Right Ans - Targeted Price

Document information

Uploaded on
February 13, 2025
Number of pages
5
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StudyHall
3.8
(225)
Sold
1337
Followers
825
Items
17071
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions