TPC 319 Electrical installation
A copy of the manufacturer's test data is often attached to the ______ of new equipment. -
ANS-manual
TPC 319 Electrical installation p.78
Before new equipment arrives at the plant, plans for installing it are made by the... -
ANS-plant engineer
TPC 319 Electrical installation p.4
High temperatures during equipment start-up is usually caused by... - ANS-poor lubrication
TPC 319 Electrical installation p.79
How long must new concrete sit before you can install equipment on it? - ANS-28 days
TPC 319 Electrical installation p.13
If new equipment is damaged in shipment you should report it to the... - ANS-carrier
If the fluid in a system is thick, you control it with a ______ check valve. - ANS-ball
TPC 319 Electrical installation p.74
If you have no clearance to remove a sling after setting the equipment down, you should
lower the equipment onto... - ANS-wedges
TPC 319 Electrical installation p.48
Retainers on the sides of horizontally reciprocating equipment keep it from... - ANS-walking
TPC 319 Electrical installation p.21
The best materials for filling around a foundation are gravel and ... - ANS-ground concrete
slabs
TPC 319 Electrical installation p.11
The common dial indicator is usually used with a ______ base. - ANS-magnetic
TPC 319 Electrical installation p.61
The external air lines on equipment usually terminate just beyond a filter or a... -
ANS-regulator
TPC 319 Electrical installation p.72
The type of bolt to anchor the equipment is usually specified by the... - ANS-equipment
manufacturer
TPC 319 Electrical installation p.11
To drill anchor bolt holes larger than 1 1/2 in, you should use a... - ANS-core bit with a
diamond or carbon tip
A copy of the manufacturer's test data is often attached to the ______ of new equipment. -
ANS-manual
TPC 319 Electrical installation p.78
Before new equipment arrives at the plant, plans for installing it are made by the... -
ANS-plant engineer
TPC 319 Electrical installation p.4
High temperatures during equipment start-up is usually caused by... - ANS-poor lubrication
TPC 319 Electrical installation p.79
How long must new concrete sit before you can install equipment on it? - ANS-28 days
TPC 319 Electrical installation p.13
If new equipment is damaged in shipment you should report it to the... - ANS-carrier
If the fluid in a system is thick, you control it with a ______ check valve. - ANS-ball
TPC 319 Electrical installation p.74
If you have no clearance to remove a sling after setting the equipment down, you should
lower the equipment onto... - ANS-wedges
TPC 319 Electrical installation p.48
Retainers on the sides of horizontally reciprocating equipment keep it from... - ANS-walking
TPC 319 Electrical installation p.21
The best materials for filling around a foundation are gravel and ... - ANS-ground concrete
slabs
TPC 319 Electrical installation p.11
The common dial indicator is usually used with a ______ base. - ANS-magnetic
TPC 319 Electrical installation p.61
The external air lines on equipment usually terminate just beyond a filter or a... -
ANS-regulator
TPC 319 Electrical installation p.72
The type of bolt to anchor the equipment is usually specified by the... - ANS-equipment
manufacturer
TPC 319 Electrical installation p.11
To drill anchor bolt holes larger than 1 1/2 in, you should use a... - ANS-core bit with a
diamond or carbon tip