a
a
a
a
California ICC Technician questions and
a a a a
answers latest top score.
a a a a a
a
a
a
a
a
a
a
a
a
a
a
a
a
1. aI ado aa a____ aafter areplacing aa aspout ato aa aHealy a900 anozzle a- acorrect
aanswers.shut aoff a
a
test
a
2. In aa abalance ahose athe agasoline aflows ain a- acorrect aanswers.Inner ahose a
a
3. After athe ainstallation aof athe avapor apiping aand abefore aback afilling, aPEI a300
asuggests asome amethods ato adocument apiping alayout, aexcept? a- acorrect
aanswers.Drawing awith aa apen, apipe alayout aon athe acover aof athe atank amanual. a
a
4. During aVO-1000 ayou adon't a- acorrect aanswers.Work awithout aeye aprotection a
a
5. aAn aOverfill aAlarm adevice aneeds ato abe alocated a- acorrect aanswers.Where ait acan abe
aheard a
a
or aseen aby athe adelivery
alocation.
a
6. aWhen ain aa aGDF ayou acan aavoid athe ainstallation aof aUDC? a- acorrect
aanswers.No a
a
exceptions aof aany
aGDF.
a
7. aWhat ais aconsidered aan aUnderground aStorage aTank? a- acorrect aanswers.Tank
aand a
a
pipping
aonly
a
8. aGasoline avapors aare a3/4 atimes a_____ athan aair a- acorrect aanswers.Heavier a
a
9. aCompounds awith aa ahigh avapor apressure asuch aas agasoline awill aevaporate areadily
aand a
a
will atypically a- acorrect aanswers.Have aa alow
aFlashpoint.
a
, 10. aThe a____ ais athe avalve athat acontrols apressure aand avacuum aon athe atank. a-
acorrect a
a
answers.P/V
aValve
a
11. aThe avapor apiping amust abe aall, abut anot a- acorrect aanswers.Compatible
awith a
a
underground
aenvironment.
a
12. The aShear aValve ais ainstalled a____ a- acorrect aanswers.At athe abase aof athe
adispenser. a
a
13. What ais athe amax alength aof aa aHealy aHose aPhase a2? a- acorrect aanswers.20 aFeet. a
a
14 aA a___ ais aa acomponent aof athe ahanging ahardware athat aseparates awhen ait's
aapplied aa a
a
force? a- acorrect
aanswers.Breakaway.
a
15. aUL alisted ameans aall aexcept a: a- acorrect aanswers.Worldwide aApproved. a
a
16. aAfter aa adrive aoff, aa atechnician ashould anot a- acorrect aanswers.Ask aattendant ato afill
aout aa a
a
drive aoff aaccident
areport.
a
17. aThe aexecutive aorder a201-A asays athat athe areconnection aof athe abreakaway aneeds
ato abe a
a
- acorrect aanswers.Logged ain athe amaintenance
aGDF.
a
18. aWhat ais anot a a a secondary a containment a testing a method? a - a correct
aanswers.Statistical a
a
Inventory
aReconciliation.
a
19. aThe aair aclean aseperator amust abe alocated ain athe aGDF a- acorrect aanswers.No amore
athan a
a
100 aft afrom athe avent
ariser.
a
20. aThe aPEI-500 arecommends athat ato aavoid abeing ashocked aby aelectricity aor asoaked
awith a
a
gasoline athat? a- acorrect aanswers.You amust adisconnect apower ato aall aelectric
adevices.
a