When a construction project is "put out" for bid, the contractors are given the plans and
specifications for the project. If any deviations for these specifications occur, who will be
held responsible and may be required to correct them at their own expense?
, The contractor
The ______ for a protect are interpreted as a legal document that specifically defines the
responsibilities of the owner and his representatives intended for the project and what the
contractors responsibilities are.
specifications
The CSI-MASTERFORMAT divides the specifications into __________ specific divisions to
provide a standard reference and filing numbers for bidding and contract forms.
50
Which of the following would appear as a heading in the index of the General Clauses and
Conditions sections of General Requirements?
All of these ( General Conditions, Notice to Bidders and Proposal)
_________ is the contractors price for performing the work as specified.
The proposal
"Contract Documents" "Insurance," "payments," and "Guarantee" are some typical items that
would be included under what heading in the General Clauses and Conditions section?
General Conditions
The square footage method of estimating is always recommended for lump-sum contracts.
False
The typical _______ provides the necessary control devices for the accumulation of estimates
into the final bid.
Estimate summary sheet
What type of estimate is an accurate estimating method that consists of listing all material
and labor needed for an element of work or project
Detailed Survey
_________ estimates are used as a check to determine if sufficient materials are available to
construct or complete a project.
Material
Which of the following are types of labor estimates?
I. Preliminary manpower estimates
II. Detailed manpower estimates
III.Production manpower estimates