Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

NERC PREP TEST 101| 200 QUESTIONS| WITH COMPLETE SOLUTIONS

Document preview thumbnail
Preview 2 out of 10 pages

NERC PREP TEST 101| 200 QUESTIONS| WITH COMPLETE SOLUTIONS .allowable frequency variation during system resto - Answer-59.75 hz - 61 hz (also saw 59.5 hz) .allowable voltage variation during normal condtions - Answer-+/- 5% .allowable voltage variation during sys restoration - Answer-+/- 10% .amount of interchange transaction intermediate BAs receive for losses - Answer-3% of transaction .At what power angle will ensure reactive power flows from higher voltage to lower voltage? - Answer-10 degrees .CPS 2 requirement - Answer-greater than or equal to 90% for month (10 minute intervals) .CPS1 requirement - Answer-greater than or equal to 100% for rolling 12 month period .DCS requirement for recovery period - Answer-90 minutes after the end of disturbance period .DCS requirement to return to pre disturbance condition - Answer-15 minutes .define EA levels - Answer-EEA 1) all available resources in use, EEA 2) load management in effect EEA 3) firm load shed .distribution voltages - Answer-240, 120, 4, 13, 26, 69 kv .DOE Reporting Conditions - Answer-300 MW uncontrolled loss of load 100MW Firm load shed 50,000 customers out of power greater than 1 hr 3% Voltage reduction Public appeals to reduce load vandalism, sabotage .During evaluation of an arranged Interchange, what factors must BAs review? - Answer-1) Scheduling path (all) 2) Ramping & Energy Profile (magnitude) (source and sink) .During evaluation of an arranged Interchange, what factors must TSP review? - Answer-Scheduling path .Emergency Plan Applicable elements - Answer-fueld supply & inventory, fuel switching, optimize fuel supply, environmental constraints, public appeals, requests of govt, notify Independent Power Providers, system energy use, maximize gen output, load management, interruptible & curtailable load, notification of govt agencies, notification to other entities .Emergency plans by the TOP and BA must include - Answer-1) Communications protocols 2) List of controlling actions to mitigate the emergency 3) Tasks to be coordinated with neighboring entities 4) staffing levels .Explain value that adjacent BAs must agree on - Answer-Composite Confirmed Interchange: adjacent BAs must agree at mutually agreed intervals on: 1) identical in magnitude 2) opposite in sign

Content preview

NERC PREP TEST 101| 200 QUESTIONS|
WITH COMPLETE SOLUTIONS


.allowable frequency variation during system resto - Answer-59.75 hz - 61 hz (also saw 59.5 hz)




it h
.allowable voltage variation during normal condtions - Answer-+/- 5%




w
.allowable voltage variation during sys restoration - Answer-+/- 10%




ce
.amount of interchange transaction intermediate BAs receive for losses - Answer-3% of transaction
d
.At what power angle will ensure reactive power flows from higher voltage to lower voltage? -


ffi
te
Answer-10 degrees



.CPS 2 requirement - Answer-greater than or equal to 90% for month (10 minute intervals)
iO
ea


.CPS1 requirement - Answer-greater than or equal to 100% for rolling 12 month period
ob
Cr



.DCS requirement for recovery period - Answer-90 minutes after the end of disturbance period



.DCS requirement to return to pre disturbance condition - Answer-15 minutes
M



.define EA levels - Answer-EEA 1) all available resources in use,

EEA 2) load management in effect

EEA 3) firm load shed

, .distribution voltages - Answer-240, 120, 4, 13, 26, 69 kv



.DOE Reporting Conditions - Answer-300 MW uncontrolled loss of load

100MW Firm load shed

50,000 customers out of power greater than 1 hr

3% Voltage reduction




it h
Public appeals to reduce load

vandalism, sabotage




w
.During evaluation of an arranged Interchange, what factors must BAs review? - Answer-1)
Scheduling path (all)




ce
2) Ramping & Energy Profile (magnitude) (source and sink)
d
ffi
.During evaluation of an arranged Interchange, what factors must TSP review? - Answer-Scheduling
te
path
iO
ea


.Emergency Plan Applicable elements - Answer-fueld supply & inventory, fuel switching, optimize
fuel supply, environmental constraints, public appeals, requests of govt, notify Independent Power
Providers, system energy use, maximize gen output, load management, interruptible & curtailable
load, notification of govt agencies, notification to other entities
ob
Cr




.Emergency plans by the TOP and BA must include - Answer-1) Communications protocols

2) List of controlling actions to mitigate the emergency
M



3) Tasks to be coordinated with neighboring entities

4) staffing levels



.Explain value that adjacent BAs must agree on - Answer-Composite Confirmed Interchange:
adjacent BAs must agree at mutually agreed intervals on:

1) identical in magnitude

2) opposite in sign

Document information

Uploaded on
February 6, 2025
Number of pages
10
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$8.19

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Examcore
3.8
(8)
Sold
39
Followers
11
Items
1791
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions