Erosion and Sediment Control Certification || Questions and 100% Verified Answers.

Document preview thumbnail
Preview 2 out of 14 pages

The following type of material is used in the installation of silt fence and super silt fence: a. woven slit film b. woven monofilament c. nonwoven d. none of the above correct answers a. woven slit film Per the ASTM D-4355 test method, all geotextiles used in MD for erosion and sediment control must have an ultraviolet retention strength rating of at least: a. 70% b. 95% c. 60% d. 50% correct answers a. 70% In determining a stone classification size, the stone must be a well graded mixture where 50% of the pieces by weight are below the weight of the midsize indicated as d50. a. true b. false correct answers a. true A local jurisdiction may have stricter requirements than the State for material specifications. a. true b. false correct answers a. true The minimum gauge wire for use in gabion baskets is: a. 7 b. 12 c. 15 d. 11 correct answers d. 11 The best way to prevent erosion is: a. double up the silt fence b. install a good working sediment trap c. minimize the disturbed area and quickly re-establish vegetative cover d. schedule construction when rain is not forecasted correct answers c. minimize the disturbed area and quickly re-establish vegetative cover Following initial soil disturbance or re-disturbance, permanent or temporary stabilization must be completed within __________ calendar days for all perimeter dikes, swales, ditches, perimeter slopes, and all slopes steeper than 3:1; and __________ calendar days for all other disturbed or graded areas on the project site not under active grading. a. 1, 2 b. 3, 7 c. 7, 14

Content preview

Erosion and Sediment Control Certification || Questions and
100% Verified Answers.
The following type of material is used in the installation of silt fence and super silt fence:
a. woven slit film
b. woven monofilament
c. nonwoven
d. none of the above correct answers a. woven slit film

Per the ASTM D-4355 test method, all geotextiles used in MD for erosion and sediment control
must have an ultraviolet retention strength rating of at least:
a. 70%
b. 95%
c. 60%
d. 50% correct answers a. 70%

In determining a stone classification size, the stone must be a well graded mixture where 50% of
the pieces by weight are below the weight of the midsize indicated as d50.
a. true
b. false correct answers a. true

A local jurisdiction may have stricter requirements than the State for material specifications.
a. true
b. false correct answers a. true

The minimum gauge wire for use in gabion baskets is:
a. 7
b. 12
c. 15
d. 11 correct answers d. 11

The best way to prevent erosion is:
a. double up the silt fence
b. install a good working sediment trap
c. minimize the disturbed area and quickly re-establish vegetative cover
d. schedule construction when rain is not forecasted correct answers c. minimize the disturbed
area and quickly re-establish vegetative cover

Following initial soil disturbance or re-disturbance, permanent or temporary stabilization must be
completed within __________ calendar days for all perimeter dikes, swales, ditches, perimeter
slopes, and all slopes steeper than 3:1; and __________ calendar days for all other disturbed or
graded areas on the project site not under active grading.
a. 1, 2
b. 3, 7
c. 7, 14

, d. 14, 21 correct answers b. 3, 7

Adequate vegetative cover requires __________ percent ground cover.
a. 50
b. 80
c. 95
d. 100 correct answers c. 95

An earth dike must be stabilized within 3 days of installation.
a. true
b. false correct answers a. true

A stabilized construction entrance:
a. is made up of Class I riprap or equivalent recycled concrete
b. uses nonwoven geotextile underneath the stone/recycled concrete
c. should slope toward the exterior of the site so runoff from SCE flows offsite
d. none of the above correct answers b. uses nonwoven geotextile underneath the stone/recycled
concrete

Other than for a single-family home the minimum length of a stabilized construction entrance is:
a. 25 feet
b. 30 feet
c. 50 feet
d. 60 feet correct answers c. 50 feet

The discharge from a SCE washrack should not be directed toward silt fence.
a. true
b. false correct answers a. true

Benching is required on a slope steeper than 2:1 if its height is greater than:
a. 20 feet
b. 30 feet
c. 45 feet
d. 50 feet correct answers a. 20 feet

The primary purpose of benching or serrated slopes is to:
a. provide additional area for landscaping
b. break up the surface flow of runoff on long steep slopes
c. provide a level area for wildlife crossing
d. none of the above correct answers b. break up the surface flow of runoff on long steep slopes

Temporary stabilization is not required during the winter.
a. true
b. false correct answers b. false

Incremental stabilization should occur for every __________ feet of cut or fill.

Document information

Uploaded on
February 6, 2025
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SirAnton
3.7
(118)
Sold
807
Followers
438
Items
40071
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions