Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 68 pages
Exam (elaborations)

SOS NERC Prep - RELIABILITY Exam Questions with Correct Answers.

Document preview thumbnail
Preview 4 out of 68 pages

SOS NERC Prep - RELIABILITY Exam Questions with Correct Answers. The Reliability Coordinator just informed you of a slow time error correction which will begin at the top of the next hour. Your EMS system will not let you change your scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action should you take? A) Increase Net Interchange Schedule by 20 MWs. B) Inform the Reliability Coordinator that you cannot participate in the time error correction. C) Decrease Net Interchange Schedule by 20 MWs. D) Increase Net Interchange Schedule by 10 MWs. - Correct Answer A) Increase Net Interchange Schedule by 20 MWs. A Balancing Authority has a sudden loss of a large block of load in its area. This loss will be seen instantaneously in the

Content preview

SOS NERC Prep - RELIABILITY Exam Questions with Correct
Answers.

The Reliability Coordinator just informed you of a slow time error correction which will
begin at the top of the next hour. Your EMS system will not let you change your
scheduled frequency. Your Frequency Bias Setting is -100 MW/.1Hz. What action
should you take?


A) Increase Net Interchange Schedule by 20 MWs.


B) Inform the Reliability Coordinator that you cannot participate in the time error
correction.


C) Decrease Net Interchange Schedule by 20 MWs.


D) Increase Net Interchange Schedule by 10 MWs. - Correct Answer A) Increase Net
Interchange Schedule by 20 MWs.


A Balancing Authority has a sudden loss of a large block of load in its area. This loss
will be seen instantaneously in the change of which of the following values?


1. Actual Net Interchange
2. Scheduled Frequency
3. Scheduled Net Interchange
4. Area Control Error


A) 4 only
B) 1 & 3
C) 1 & 4
D) 3 & 4 - Correct Answer C) 1 & 4


Metered Data included in the calculation of ACE are: dynamic schedules, pseudo ties,
actual frequency, and all __________.


A) Tie lines readings

,B) Generators output
C) Scheduled frequency indications
D) Transformer load - Correct Answer A) Tie lines readings


Balancing Authority A is currently reading a system frequency of 60.00 Hz. Its Net
Actual Interchange is +100 MW and its Net Scheduled Interchange is +200 MW. If
Balancing Authority A's frequency bias setting is 100 MW/0.1 Hz, what is ACE?


A) -100
B) 0
C) 10
D) 100 - Correct Answer A) -100


A Balancing Authority has a Net Interchange Schedule of -250 MWs from 1200 to 1600
on a summer day. The Net Interchange Actual for those same hours respectively were -
230 MW, -275 MW, -250 MW and -270 MW. What was the Balancing Authority's
Inadvertent Interchange for the 4-hour period?


A) 6 MWs out
B) 25 MWs in
C) 25 MWs out
D) 6 MWs in - Correct Answer B) 25 MWs in


For the ACE equation to work properly, dynamic schedules, pseudo ties, frequency, and
all ________________ must be metered.


A) Generation
B) Communications
C) Transformers
D) Tie lines - Correct Answer D) Tie lines


If the frequency bias setting is set to a less negative value than the frequency response
of a Balancing Authority and a frequency increase is caused by a sudden loss of load in
an external balancing area, what will be the result?

,A) The ACE will be zero and will take no AGC action


B) The ACE will be a negative value and AGC will increase generation


C) The ACE will be a positive value and AGC will lower generation


D)This will not affect the ACE - Correct Answer B) The ACE will be a negative value and
AGC will increase generation


If the frequency bias setting is less negative than the frequency response of a Balancing
Authority and a frequency decline is caused by a sudden loss of generation in an
external balancing area, what will be the result?


A) The ACE will be a negative value and AGC will increase generation.


B) This will not affect the ACE.


C) The ACE will be a positive value and AGC will lower generation.


D) The ACE will be zero and will take no AGC action. - Correct Answer C) The ACE will
be a positive value and AGC will lower generation.


It is the responsibility of which entity/entities to develop, maintain, and implement load
shedding plans?


A) Transmission Operators and Balancing Authorities


B) Reliability Coordinator


C) Load Serving Entities


D) Balancing Authority - Correct Answer A) Transmission Operators and Balancing
Authorities

, A Transmission line is loaded 25% above its SOL. A parallel line is out for routine
maintenance and can be placed in service in 10 minutes. What is the first step the
Operator should take to reduce the line loading?


A)Shed load at the downstream bus.


B) Open the line.


C) Re-Dispatch Generation.


D) Initiate the restoration of the parallel line. - Correct Answer D) Initiate the restoration
of the parallel line.


As a Transmission Operator, you realize that the voltage level is starting to decline in
the North West part of the system. Which of the following devices should you, as a
Transmission Operator, be able to operate, and/or have another entity operate to raise
the voltage level back to normal in the North West part of the system?


A) Transformer Underload Tap Changers
B) Shunt Capacitor Banks
C) Generator Reactive Output
D) All answers are correct - Correct Answer D) All answers are correct


Voltage reduction for load relief should be made on the __________.


A) Distribution system
B) Entire Interconnection simultaneously
C) Tie-lines with other Balancing Authority Areas
D) Transmission System - Correct Answer A) Distribution system


Under Frequency Load Shedding (UFLS) is to stabilize the imbalance between
generation and load that has been created by a system disturbance. This is
accomplished by ____________.


A) Tripping generation first

Document information

Uploaded on
February 5, 2025
Number of pages
68
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Excellentgrader
4.0
(23)
Sold
116
Followers
92
Items
6637
Last sold
2 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions