NERC Contingency Analysis and Reliability Exam Review Questions and Answers. What is an Operating Instruction? - Correct Answer Real-time Operating personnel command to change or preserve the state of an element of the BES The Transmission Operator experiences an unexpected line outage which results in the subsequent loading of a parallel line at 101% of its SOL, what action should the Transmission Operator take?Select all that apply. - Correct Answer Inform the Reliability Coordinator Take the appropriate action to return the system to within normal limits A Generator Operator receives an Operating Instruction from its Transmission Operator to bring on additional generation to mitigate a low voltage situation. The Generator Operator must comply with the Operating Instruction unless: - Correct Answer It results in safety concerns or environmental violations

Content preview

NERC Contingency Analysis and Reliability Exam Review
Questions and Answers.

What is an Operating Instruction? - Correct Answer Real-time Operating personnel
command to change or preserve the state of an element of the BES


The Transmission Operator experiences an unexpected line outage which results in the
subsequent loading of a parallel line at 101% of its SOL, what action should the
Transmission Operator take?Select all that apply. - Correct Answer Inform the Reliability
Coordinator


Take the appropriate action to return the system to within normal limits


A Generator Operator receives an Operating Instruction from its Transmission Operator
to bring on additional generation to mitigate a low voltage situation. The Generator
Operator must comply with the Operating Instruction unless: - Correct Answer It results
in safety concerns or environmental violations


A Transmission Operator performs a Real-time Assessment that identifies a SOL
exceedance. What should the Transmission Operator do next?
Contact the Reliability Coordinator and ask for assistance - Correct Answer Initiate its
Operating Plan to mitigate the SOL exceedance


Unless it's an emergency, Transmission Operators should not remove Bulk Electric
System facilities from service until which of the following actions is completed? - Correct
Answer A Real-time Assessment of the transmission facility outage is completed


When another Transmission Operator requests emergency actions to be implemented
in your area, what is the expectation? - Correct Answer The requesting TOP has also
implemented emergency actions


Which are the three types of limits to consider when determining system limits? Select
all that apply.


Angle stability
Impedance
Thermal

, Voltage - Correct Answer Angle stability
Thermal
Voltage

A transmission system must be operated so that which of the following will not occur as
a result of a single contingency? - Correct Answer Instability, uncontrolled separation, or
cascading outages


Which of the following actions would a Transmission Operator be expected to take, or
direct others to take, to mitigate SOL and IROL violations?Select all that apply.


Shed load
Change limit
Disconnect from neighbors
Change the output of generators
Reduce Interchange - Correct Answer Change the output of generators
Reduce Interchange
Shed load


Why is it necessary to report SOL and IROL exceedances to the Reliability
Coordinator? - Correct Answer The Reliability Coordinator will then evaluate actions
being taken and direct additional corrective actions as needed


Which of the following must a Transmission Operator monitor to determine SOL
exceedances within its area?Select all that apply.


Status of Remedial Action Schemes in its TOP area


BES Facilities within its TOP area


Status, voltage, and flow data outside its TOP area identified as necessary


Non-BES facilities within its TOP area identified as necessary - Correct Answer Status
of Remedial Action Schemes in its TOP area

Document information

Uploaded on
February 5, 2025
Number of pages
14
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$18.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
LECTME
3.5
(2)
Sold
8
Followers
4
Items
2894
Last sold
4 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions