The discharger shall ensure a QSP develop a Rain Event Action
Plan (REAP) hours prior to any likely precipitation event.
a. Immediately
b. 24 hours
c. 48 hours
d. ASAP but not more than 72 hours - ANSWER-C
A likely precipitation event is any weather pattern that is
forecasted to have a
% or greater probability of producing precipitation in the
project area.
a. 10
b. 25
c. 50
d. 75
e. 99 - ANSWER-C
TRUE OR FALSE: At Risk Level 2 & 3 sites, receiving water
monitoring is required if the receiving water monitoring
trigger exceeded pH, turbidity and SSC. Bioassessment for
sites 30 acres or larger. - ANSWER-False (Risk level 3 only)
, Visual monitoring is required for non-storm water, pre-rain
and post-rain at what Risk Levels?
a. Risk Level 1
b. Risk Level 2
c. Risk Level 3
d. All of the above
e. Risk Level 1 & 2 - ANSWER-D
A storm that produces ½ inch or more of precipitation, with a
48 hour or greater period between rain events is a/an...
a. Qualifying rain event
b. Extended storm event
c. Inactive storm event
d. Unsafe monitoring event - ANSWER-A
Upload photos to SMARTS that are taken during daily
inspections of the LUP site before, during, and after every
storm event
a. First
b. Second
c. Third
d. Fourth - ANSWER-C
Which statement is false? Monitoring is not required when:
a. the site/sampling locations are unsafe to access due to
the storm event
100% Verified Answers ALREADY
GRADED A+
The discharger shall ensure a QSP develop a Rain Event Action
Plan (REAP) hours prior to any likely precipitation event.
a. Immediately
b. 24 hours
c. 48 hours
d. ASAP but not more than 72 hours - ANSWER-C
A likely precipitation event is any weather pattern that is
forecasted to have a
% or greater probability of producing precipitation in the
project area.
a. 10
b. 25
c. 50
d. 75
e. 99 - ANSWER-C
TRUE OR FALSE: At Risk Level 2 & 3 sites, receiving water
monitoring is required if the receiving water monitoring
trigger exceeded pH, turbidity and SSC. Bioassessment for
sites 30 acres or larger. - ANSWER-False (Risk level 3 only)
, Visual monitoring is required for non-storm water, pre-rain
and post-rain at what Risk Levels?
a. Risk Level 1
b. Risk Level 2
c. Risk Level 3
d. All of the above
e. Risk Level 1 & 2 - ANSWER-D
A storm that produces ½ inch or more of precipitation, with a
48 hour or greater period between rain events is a/an...
a. Qualifying rain event
b. Extended storm event
c. Inactive storm event
d. Unsafe monitoring event - ANSWER-A
Upload photos to SMARTS that are taken during daily
inspections of the LUP site before, during, and after every
storm event
a. First
b. Second
c. Third
d. Fourth - ANSWER-C
Which statement is false? Monitoring is not required when:
a. the site/sampling locations are unsafe to access due to
the storm event